New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:23 PM
Creation date
6/25/2008 10:43:59 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This Chan a Order Total $ 31578.00 <br /> Previous Chan a Order s Total $ 2 024.00 <br /> Revised Contract Total $ 16 622 777.71 <br /> <br /> ~r? The time provided for completion in the contract is (unchanged) (decreased) (increased) by <br /> Unch,_ <br /> speed <br /> working days. This document shall become an amendment to the contract and all <br /> provisions of the contract will apply. Changes aze shown on Drawing(s) No. dated Revisions to <br /> P-152 specification dated 9/13/04. new P-154 specification dated 9/13/04 and gradation of 3 inch <br /> crushed rock. dated 9/13/04, three copies att he . <br /> Recommended by: William Ness 9/22/04 <br /> Engineer ate <br /> Approved by: e-~x-~ ~ l~ c, ~z` <br /> Owner ~ L D e <br /> Accepted by: <br /> Co tract r Date <br /> Concurred by: 1 t /f S~o ~l <br /> State Aeronautics (if a icable) Date <br /> Approved by: Suzanne LePan~ <br /> Federal Aviation Administration Date <br /> NOTE: Change Orders and Supplemental Agreements require FAA approval prior to construction, <br /> otherwise no Federal participation can be granted. State Aeronautics concurrence is required when <br /> state participation is anticipated. <br /> Page 2 of 2 pages <br /> AIP PROJECT NO. 3-41-0028-33/34 CHANGE ORDER NO. 2 <br /> (Supplemental Agreement) <br /> AIRPORT Eugene Airport -Parallel Runway LOCATION Eugene, Oregon <br /> Project <br /> JUSTIFICATION FOR CHANGE <br /> 1. Brief description of the proposed contract change(s) and location(s). <br /> a. Runway 16U34R - (1) Reduce the compaction required in the middle 12-inches of the P-152 sub- <br /> grade embankment from 95% to 92%, (2) Replace the top 12-inches of the P-152 sub-grade <br /> embankment with imported baz run, (3) Revise the testing requirements for the imported baz run <br /> portion of the P-152 embanlanent, (4) Remove the geotextile fabric, and (4) Eliminate requirement for <br /> the P-154 Sub-base to be crushed and angulaz, (5) Revise P-154 specification testing requirements. <br /> 2. Taxiway B and interconnecting taxiways (1) Replace 8-inch layer of P-154 Sub-base with 3-inch <br /> minus crushed rock. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.