1 <br /> Run Date: 02/10/2005 14:08:56 Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 008 <br /> Contractor: WILDISH CONST. Original Contract: $16,589,175.71 <br /> Job 93-004183 Current Amount: $16,715,116.15 <br /> Contract No: 2004-00024 Contract Award Date: 06/07/2004 <br /> PO 2004100581 Completion Date: 10/15/2006 <br /> Assessable: No <br /> Current Contract Batimated Payment Cumulative Totals 6 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0690 HXCAVATION, UNCLASSIFIED $3.00 CUYD 5,000.000 $15,000.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0700 BORROW $4.20 CUYD 42,900.000 <br /> $180,180.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0710 Hl~RGSNCY EROSION CONTROL MOBI $400.00 HACH 2.000 <br /> $800 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 0720 REMOVB BUILDINGS (RSSIDSNCH) $25,000.00 LUMPSUM 1.000 $25,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0730 REMOVB FLUSHING RISER $200.00 HACH 2.000 $400.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0740 CRUSHED AGGRHGATB BASH COURSH $9.00 TON 4,480.000 $40,320.00 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0750 3• MINUS CRUSHED QUARRY ROCK $8.50 TON 23,342.000 $198,407.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0760 BITUMINOUS CONCRHTB PAVEMENT ( $30.00 TON 54,027.000 $1,620,810.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0770 BITUMINOUS PAVHMHNT QUALITY CO $0.50 TON 58 005.000 <br /> $29 002 50 0 000 $0 00 0 000 $0 00 0 00 <br /> 0780 BITUMINOUS SAWCUT GROOVING $0.90 SQYD 86,378.000 $77,740.20 0.000 $0.00 0.000 $0.00 0.00 <br /> 0790 PAVEMENT MARKING, WHITH, TYPE $0.30 SQFT 94,096.000 $28,228.80 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0800 PAVEMHNT MARKING, YBLLOW, TYPB $0.30 SQFT 20 438.000 <br /> $6 131 40 0 000 $0 00 0 000 $0 00 0 00 <br /> 0810 REFLBCTIVS MEDIA, TYPB 1, GRAD $0.30 POVND 6,972.000 $2,091.60 0.000 $0.00 0.000 $0.00 0.00 <br /> 0820 COAL-TAR PITCH $2.80 SQYD 8,063.000 <br /> $22,576.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0830 CONCRETE LIGHT PAD $270.00 EACH 395 000 $106 650 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 0840 FIELD LABORATORY $1,000.00 LUMPSUM 1.000 $1,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0850 LIGHTBD CLOSURE CROSS MAINTSNA $50.00 DAY 75.000 $3,750.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0860 GHOTBXTILB FABRIC, TYPE SR $0.65 SQYD 62 086 000 $40 355 90 0 000 $0 00 0 000 $0 00 0 00 <br /> 0870 MHDZUM RANDOM RIPRAP $50.00 CUYD 250.000 $12,500.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0880 8' CHAIN-LINK FHNCE $16.00 LINPT 12,663.000 <br /> $202,608.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0890 PEDESTRIAN GATE $800.00 HACH 2.000 $1 600.00 0.000 $0.00 0.000 $0 00 0 00 <br /> 0900 8' HIGH CANTILEVER GATB $2,700.00 EACH 8.000 $21,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0910 GATE OPHRATOR AND EQUI DEMENT, $45,000.00 LUMPSUM 1.000 $45,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0920 GATE OPBRATOR-AND 8QU1P-0OINT G $45 000-00 F.UMPSUM i 000- <br /> $45 90009 9 900 $O 90 - OOOII- $0 00 0 00 <br /> <br />