Run Date: 12/07/2005 09:24:06 <br /> Page 6 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Daymaat No a 019 <br /> Contractor: WILDISN CONST. Original Contract: $16,589,175.71 <br /> Job 8: 93-004183 Current Amount: $17,409,276.88 <br /> Contract No: 2009-00024 Contract Award Date: 06/07/2004 <br /> PO 8: 2004100581 Completion Date: 10/15/2006 <br /> Assessable: No <br /> Current Contract estimated Payment Cumulative Totals t Complete <br /> Line Description Laet Chug Ord Uai[ Price Uait Measure Quantity Amount Quaati<y Amount Quantity Amount <br /> 0770 BITUMINOUS PAVEMENT QUALITY CO $0.50 TON 58 005 000 <br /> $29 002 50 0 000 $0 00 58 005 000 $29 002 50 100 00 <br /> 0780 BITUMZNOUB SAWCUT GROOVING $0.90 SQYD 86,378.000 <br /> $77,740.20 0.000 $0.00 86,378.000 $77,740.20 100.00 <br /> 0790 PAVEMENT MARKING, WHITH, TYpH $0.30 SQPT 94,096.000 <br /> $28,228.80 0.000 $0.00 91,000.000 $28,200.00 100.00 <br /> 0800 PAVEMENT MARRING, YELLOW, TYPE $0 30 SOPf 30 438 000 <br /> $6 131 40 0 000 $0 00 20 000 000 $6 000 00 98 00 <br /> 0810 REFLECTIVE MEDZA, TYPE 1, GRAD $0.30 POUND 6,972.000 <br /> $2,091.60 0.000 $0.00 6,900.000 $2,070.00 99.00 <br /> 0820 COAL-TAR PITCH $2.80 SQYD 8,063.000 <br /> $22,576.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0830 CONCRETE LIGHT PAD $270 00 EACH 395 000 <br /> $106 650 00 0 000 $0 00 218 000 $58,860 00 55 00 _ <br /> OB40 FIELD LABORATORY $1,000.00 LVMPSUM 1.000 <br /> $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br /> 0850 LIGHTHD CLOSURE CROSS MAINTHNA $50.00 DAY 75.000 <br /> $3,750.00 0.000 $0.00 92.000 $4,600.00 123.00 <br /> 0860 GEOTEXTILS FABRIC, TYPE SR $0.65 SQYD 62 086 000 <br /> $40 355 90 0 000 $0 00 62 OB6 000 $40 355 90 100 00 <br /> OB70 MEDIUM RANDOM RIPRAP $50.00 CUYD 2$0.000 <br /> $12,500.00 0.000 $0.00 16.000 $800.00 6.00 <br /> 0880 8' CHAIN-LINK FENCE $16.00 LINPT 12,663.000 $502,608.00 159.000 $2,544.00 11,627.200 $186,035.20 92.00 <br /> 0890 PSD68TRIAN GATT 9800.00 SACE 2.000 <br /> 81,600.00 3.000 $2,400.00 3.000 $2,400.00 150.00 <br /> 0900 B' HIGH CANTILEVER GAT6 $2,700.00 EACH 8.000 $21,600.00 0.000 $0.00 8.000 $21,600.00 100.00 <br /> 0910 GATE OPBRATOR AND EQUI DEMENT, $45,000.00 LUMP3UM 1.000 <br /> $45,000.00 0.120 $5,400.00 0.220 $9,900.00 22.00 <br /> 0930 GATE OPERATOR AND EQUIPMENT, G $45 000 00 LUMPSUM 1 000 <br /> $45 000 00 0 120 $5 400 00 0.220 $9 900.00 22.00 <br /> 0930 GATH OPERATOR AND EQUI PMHNT, G $45,000.00 LUMPSUM 1.000 <br /> $45,000.00 0.220 $5,400.00 0.220 $9,900.00 22.00 <br /> 0940 RSLOGTH ZIIICS $U .50 LINFT 3,733.000 <br /> $39,628.50 0.000 $0.00 3,812.000 $55,274.00 139.00 <br /> 0950 SPARE GATE EQVIPMENT $1 400 00 LUMPSUM 1 000 <br /> $1 400 00 0 000 $0 00 0 000 $0 00 0 00 <br /> <br /> 0960 15 INCN STORM SEWER $35.00 LINPT 421.000 $14,735.00 0.000 $0.00 450.000 $15,750.00 107.00 <br /> <br />