<br /> Run Date: 03/08/2006 13:56:37
<br /> Page 5
<br /> City of Hugene
<br /> Contract Preliminary Progress Payment
<br /> ` Payment No : 023
<br /> Contractor: WILDISH CONST. Original Contract: $16,589,175.71
<br /> Job 93-004183 Current Amount: $17,497,460.40
<br /> Contract No: 2004-00024 Contract Award Date: 06/07/2004
<br /> PO 2004100581 Completion Date: 10/15/2006
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals $ Complete
<br /> Line Description Iast Chag Ord Unit Price Uait Measure Quaat ity Amount Quantity Amount Quantity Amount
<br /> 0580 4" 2-WAY DUCT $8.00 LINFT 437.000 $3,496.00 0.000 $0.00 437.000 $3,496.00 100.00
<br /> 0590 4" 3-WAY DUCE $11.00 LINFT 5,920.000 $65,120.00 0.000 $0.00 5,900.000 $64,900.00 100.00
<br /> 0600 4" 4-WAY DUCT $13.00 LZNFT 2,211.000
<br /> $28,743.00 0.000 $0.00 2,200.000 $28,600.00 100.00
<br /> 0610 4. 6-WAY DIICT $19.00 LINFT 2,004.000
<br /> $35,076.00 0.000 $0.00 4,007.000 $76,133.00 200.00
<br /> 0620 4" 12-NAY DUCT $38.00 LINFT 422.000 $16,036.00 0.000 $0.00 400.000 $15 200.00 95.00
<br /> 0630 4° 16-WAY DUCT $73.00 LINPT 50.000 $3,650.00 0.000 $0.00 52.000 $3,796.00 104.00
<br /> 0690 HLBCTRICAL MANHOLE $2,300.00 MACH 28.000
<br /> $64,400.00 0.000 $0.00 28.000 $64,400.00 100.00
<br /> 0650 8W8H BLHCIRICAL MANHOLE $2 400.00 EACH 10.000
<br /> $z4,ooo.oo o.ooo $o.o0 11.aoo $26,aoo.oo 110.00
<br /> 0660 CHNTRAL 8LBCIRICAL VAULT $850,000.00 LUMPSUM 1.000
<br /> $550,000.00 0.000 $0.00 0.990 $841,500.00 99.00
<br /> P8AS8 II
<br /> 0670 MOBILIZATION AND DSMOBILIZATIO $100,000.00 LUMPSUM 1.000
<br /> $100,000.00 0.000 $0.00 1.000 $100,000.00 100.00
<br /> 0680 CLEARING AND GRUBBING $8,000.00 ACRE 2.000
<br /> $16,000.00 0.000 $0.00 2.000 $16 000.00 100.00
<br /> 0690 EXCAVATION, UNCLASSIFIED $3.00 CUYD 5,000.000
<br /> $15,000.00 0.000 $0.00 5,000.000 $15,000.00 100.00
<br /> 0700 BORROW $4.20 CUYD 42,900.000 $180,180.00 0.000 $0.00 42,900.000 $180,180.00 100.00
<br /> 0710 SMBEtGENCY EROSION CONTROL MOBI $400.00 EACH 2.000
<br /> $800.00 0.000 $0.00 0.000 $0.00 0.00
<br />
<br /> 0720 REMOVE BUILDINGS (RBSIDBNCB) $25,000.00 LUMPSUM 1.000 $25,000.00 0.000 $0.00 1.000 $25,000.00 100.00
<br />
<br /> 0730 REMOVE FLUSHING RISBR $200.00 HACH 2.000
<br /> $400.00 0.000 $o.o0 2.000 $400.00 loo.oo
<br />
<br /> 0740 CRUSHID AGGREGATE HASB COURSB $9.00 TON 4 480.000
<br /> $40 320 00 0 000 $0 00 4 400 000 $39 600 00 98 00
<br />
<br /> 0750 3. 1(INUS CRU88m QIIARRY ROCK $5.50 TON 23,342.000
<br /> $198,407.00 0.000 $0.00 38,163.650 $324,561.03 164.00
<br />
<br /> 0760 BITUMINOUS CONCRBTS PAVSMHNT ( $30.00 TON 54,027.000 $1,620,810.00 0.000 $0.00 55,966.320 $1,675,989.60 104.00
<br />
<br />
|