<br /> Run Date: 05/08/2006 10:54:35 City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> ' Payaeat No 025
<br /> C~[ractor: WZLDISA CONST. Original Contract: $16,589,175.71
<br /> Job 93-004183 Current Amount: $17,527,769.59
<br /> Contract No: 2004-00024 Contract Award Date: 06/07/2004
<br /> pO 2004100581 Completion Date: 10/15/2006
<br /> Assessable: No
<br /> Current Contract Bst imated Payment Cumulative Totals 3 Complete
<br /> Line Descrintioa Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0380 CATCH BASIN TYPE 5 $3,900.00 SAGA 22.000 $85,800.00 0.000 $0.00 23.000 $89,700.00 105.00
<br /> 0390 RSINPOACBD CONCASTR INLET TlPB $1,300.00 EACH 23.000 $29,900.00 0.000 $0.00 33.000 $!2,900.00 143.00
<br /> 0400 REINFORCED CONCRETE INLETS TYP $1,800.00 SAGA 6.000 $10,800.00 0.000 $0.00 6.000 $10,800.00 100.00
<br /> 0410 RSINPORCSD CONCRETE INLET TYPE 2 400.00 SACA 8.000 19 200.00 0.000 $0.00 8.000 19 200.00 100.00
<br /> 0420 INLET COVER, TYPE A $438.00 EACH 71.000 $31,098.00 0.000 $0.00 82.000 $35,916.00 115.00
<br /> 0430 INLET COVER, TYPE H $730.00 EACH 5.000 $3,650.00 0.000 $0.00 5.000 $3,650.00 100.00
<br /> 0440 INLBT COVER TYPE C 730.00 EACH 16.000 11,680.00 0.000 0.00 16.000 $11 680.00 100.00
<br /> 0450 INLET COVER, TYPE D ~ $780.00 HACH 6.000 $4,680.00 0.000 $0.00 6.000 .$4,680.00 100.00
<br /> 0460 INLET COVER, TYPE S $820.00 EACH 1.000 $820.00 0.000 $0.00 1.000 $820.00 100.00
<br /> 0470 PIPS GRATE' 450.00 EACH 2.000 900.00 0.000 $0.00 2.000 $900.00 100.00
<br /> 0480 8• SANZTARY SSWSR PIPE $67.00 LINPT 1,683.000 $112,761.00 0.000 $0.00 1,500.000 $100,500.00 89.00
<br /> 0490 SANITARY MANHOLE $3,900.00 EACH 4.000 $15,600.00 0.000 $0.00 4.000 $15,600.00 100.00
<br /> 0500 SANITARY FORCE MAIN 35.00 LINPT 1,257.000 43,995.00 0.000 0.00 812.000 $28 420.00 65.00
<br /> 0510 SEEDING $70.00 ACRE 265.000 $18,550.00 0.000 $0.00 281.000 $19,670.00 106.00
<br /> 0520 FERTILIZING $400.00 TON 57.000 $22,800.00 0.000 $0.00 61.050 $24,420.00 107.00
<br /> 0530 MULCHING $0 09 SQYD 1 283 000 000 $115 470.00 0.000 $0.00 1 358 040 000 $122 223.60 106.
<br /> 0540 2. 2-WAY DUCT $4.50 LINFT 1,770.000 $7,965.00 0.000 $0.00 7,710.000 $34,695.00 !36.00
<br /> 0550 2. 1-WAY SWSB DUCT $7.00 LINFT 205.000 $1,435.00 0.000 $0.00 205.000 $1,435.00 100.00
<br /> 0560 3 1 WAY SWBB DUCT $5 00 LINPT 4 462 000 $22 310.00 0.000 $0.00. 4 462 000 $22 310.00 100.00
<br /> 0570 5" 1-WAY EWSB DUCT $5.50 LINFT 1,120.000 $6,160.00 0.000 $0.00 1,295.690 $7,126.30 116.00