New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 Wildish PMT 26
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 Wildish PMT 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:39:10 PM
Creation date
6/25/2008 10:19:28 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2005100396
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Rua Date: 06/06/2006 08:50:04 _ Page 12 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No a 026 <br /> Contractor: NILDISH CONST. Original Contract: $16,589,175.71 <br /> Job 93-004183 Current Amount: $17,527,769.59 <br /> Contract No: 2004-00024 COntraCt Award Date: 06/07/2004 <br /> PO 2004100581 Completion Date: 10/15/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Cling Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 1950 2" DUCT $2.50 LINFT 7,000.000 $17,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1960 DIRECTIONAL BORING CONDUIT 552.00 LINFT 1,500.000 $78,000.00 0.000 S0.00 2,265.000 $117,780.00 151.00 <br /> PHA.SB III <br /> 1970 PHl-CHANGE 2 ELEC. VAULTS 001 $1,012.00 EACH 2.000 $2 024.00 0.000 $0.00 2.000 $2,024.00 100.00 <br /> PHASE I <br /> 1980 REPLACE 8" P-154 SUB-BASE-TAXI 002 $31,578.00 LUMPSUM 1.000 $31,578.00 0.000 $0.00 1.000 $31,578.00 100.00 <br /> PHASE ZII <br /> 1990 HWEB VAULT-ERE BUILDING 003 $5,796.00 LUMPSUM 1.000 $5,796.00 0.000 $0.00 1.000 $5,796.00 100.00 <br /> 2000 HLCTRICAL BUILDING 003 $2,422.00 LUMPSUM 1.000 $2,422.00 0.000 $0.00 1.000 $2,422.00 100.00 i <br /> <br /> 2010 ADD GROUNDING TO EWSB VAULT 003 $240.00 EACH 9.000 $2,160.00 '0.000 $0.00 9.000 $2,160.00 200.00 <br /> 2020 CONC ENCASEMENT ELSC CONDUIT-U 003 $44,314.84 LUMPSUM 1.000 $44,314.84 0.000 $0.00 1.000 $44,314.84 100.00 <br /> 2030 HOLLIS CROSSING 003 $11,537.20 LUMPSUM 1.000 $11,537.20 0.000 $0.00 1.000 $11,537.20 100.00 <br /> 2040 INSTALL AC PATCH/SAN SWR LINE 004 $8,036.00 LUMPSUM 1.000 $8,036.00 0.000 $0.00 1.000 $8,036.00 100.00 <br /> 2050 CRHDIT FOR SANITARY SEWER 004 ($1,700.00) LUMPSUM 1.000 ($1,700.00) 0.000 $0.00 1.000 ($1,700.00) 100.00 <br /> 2060 REWIRE SZGN CIRCUIT 004 $374.15 EACH 1.000 $374.15 0.000 - $0.00 1.000 $374.15 100.00 <br /> 2070 UPGRADE GENERATOR 300KW FROM 2 005 $19,398.25 LUMPSUM 1.000 $19,398.25 0.000 $0.00 1.000 $19,398.25 100.00 <br /> <br /> 2060 FLASHING BLOCK MODIFICATIONS 006 $5,146.46 LUMPSUM 1.000 $5,146.46 0.000 $0.00 1.000 $5,146.46 100.00 <br /> <br /> 2090 REI,OC ELEC. METERS/CURRENT TRA 006 $446.90 LUNPSUM 1.000 $446.90 0.000 $0.00 1.000 $446.90 100.00 <br /> <br /> 2100 INSTALL FIRS EXTINGUISHER 006 $108.10 LUMPSUM 1.000 $108.10 0.000 $0.00 1.000 $108.10 100.00 <br /> <br /> 2110 4" SLAB TO 5" SLAB IN ELEC. BU 006 $53.67 LUMPSUM 1.000 $53.67 0.000 $0.00 1.000 $53.67 100.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.