|
Run Date: 08/08/2006 15:30:11
<br /> City of fiugene Page 7
<br /> Contract Preliminary Progress Payment
<br /> Payment No 028
<br /> Contractor: WILDISH CONST.
<br /> Job 93-009283 Original Contract: $16,589,175.71
<br /> Current Amount: $17,620,099.89
<br /> Contract No: 2004-00024 Contract Award Date: 06/07/2004
<br /> PO 2004100581 Completion Date: 10/15/2006
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals 6 Complete
<br /> Line Description Last C}mg Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0970 18 INCH STORK SEWER $39.00 LINFT 549.000
<br /> $21,411.00 0.000 $0.00 540.000 $21,060.00 98.00
<br /> 0980 24 INCH STORM SEWER $47.00 LINER' 163.000
<br /> $7,661.00 0.000 $0.00 160.000 $7,520.00 98.00
<br /> 0990 6-INCH UNDERDRAIN, COMPLETE $9.00 LINFT 2,000.000
<br /> $le,ooo.oo o.ooo $o.oo z,ooo.ooo SlH,ooo.oo loo.oo
<br /> 1000 CATCH BASIN TYPfi 5 $3,900.00 EACH 3.000
<br /> $11,700.00 0.000 $0.00 3.000 $11,700.00 100.00
<br /> 1010 REINFORCED CONCRETE INLET TYPE $1,300.00 EACH 1.000 $1,300.00 0.000
<br /> $0.00 1.000 $1,300.00 100.00
<br /> 1020 INLET COVER, TYPE A $438.00 EACH 1.000
<br /> $438.00 0.000 $0.00 1.000 $438.00 100.00
<br /> 1030 INLET COVER, TYPE B $730.00 EACH 3.000 $2,190.00 0.000
<br /> $0.00 3.000 $2,190.00 100.00
<br /> 1040 PIPfi GRATE $450.00 EACH 2.000
<br /> $900.00 0.000 $0.00 2.000 $900.00 100.00
<br /> 1050 SHEDZNG $70.00 ACRE 25.000
<br /> $1,750.00 0.000 $0.00 25.000 $1,750.00 100.00
<br /> 1060 FERTILIZING $400.00 TON 6.000
<br /> $2,400.00 0.000 $0.00 6.000 $2,400.00 100.00
<br /> 1070 MULCHING $0.09 SQYD 122,000.000 $10,980.00 0.000
<br /> $0.00 122,000.000 $10,980.00 100.00
<br /> 1080 5000 VOLT CABLE, NO. 8 $0.80 LINPT 98,780.000
<br /> $79,024.00 0.000 $0.00 98,780.000 $79,024.00 100.00
<br /> 1090 600 VOLT CABLE, NO. 6 $0.90 LINFT 7,200.000
<br /> $6,480.00 0.000 $0.00 7,200.000 $6,480.00 100.00
<br />
<br /> 1100 COUNTERPOISE, BARE NO. 6 $1.20 LINFT 37,255.000
<br /> $44,586.00 0.000 $0.00 37,000.000 $44,400,00 100.00
<br /> 1110 6 STRAND MULTIMODE FIBER OPTIC $2.40 LZNFT 18,885.000
<br /> $45,324.00 0.000 $0.00 19,473.000 $96,735.20 103.00
<br /> 1120 COUNTERPOISE GROUND ROD $55.00 EACH 122.000
<br /> $6,710.00 0.000 $0.00 122.000 $6,710.00 100.00
<br /> 1130 CABLE MARKERS $100.00 EACH 10.000
<br /> $1,000.00 0.000 $0.00 0.000 $0.00 0.00
<br />
<br /> 1140 L-823 CAELB BPLIC63 47.00 EACH 22.000
<br /> $564.00 0.000 $0.00 45.000 $2,115.00 375.00
<br />
<br /> 1150 2" DUCT $1.40 LINFT 44,605.000
<br /> $62,447.00 0.000 $0.00 44,500.000 $62,300.00 100.00
<br />
<br /> 1160 DIRECTIONAL BORING CONDUIT $30.00 LINFT 1,465.000
<br /> $43,950.00 0.000 $0.00 1,465.000 $43,950.00 100.00
<br />
<br />
|