Run Date: 09/05/2006 09:06:55
<br /> City of Eugene Page e
<br /> Contract Preliminary Progress Payment
<br /> Payment No 029
<br /> Contractor: WILDISH CONST.
<br /> Job 93-004183 Original Contract: $16,589,175.71
<br /> Contract No: 2004-00029 Current Amount: $17,620,099.89
<br /> PO p: 2004100581 Contract Award Date: 06/07/2004
<br /> Assessable: No Completion Date: 10/15/2006
<br /> Line Description Last Chn Ord Current Contract Estimated Payment
<br /> Unit Price Unit Measure Quantity Amount quantity emulative Totals 6 Complete
<br /> Amount Quantity Amount
<br /> 1170 DUCT Mp RKER
<br /> $80.00 EACH 10.000 $800.00 0.000
<br /> 1180 RETROREFLECTIVE MARKER, L-853 $0.00 9,000 $720.00 90.00
<br /> $51.00 EACH 810.000 $41,310.00 0.000
<br /> 1190 MITL, L-861T, BASE MOUNTED, LE $0.00 594.000 $30,294.00 73.00
<br /> $500.00 EACH 292.000 $146,000.00 0.000
<br /> 1200 HIRL, L-862, BASE MOUNTED $0.00 292.000 $146,000.00 100.00
<br /> $400.00 EACH 56.000 $22,900.00 0.000
<br /> 1210 HIRL, L-862, IN PAVEMENT $0.00 57.000 $22,800.00 102.00
<br /> $1,600.00 EACH 2.000 $3,200.00 0.000
<br /> 1220 HIRTHL, L-862 E, BASB MOUNTED $0.00 2.000 $3,200.00 100.00
<br /> $425.00 EACH 16.000 $6,800.00 0.000
<br /> 1230 L-867 BASE CAN WITH LID AND GA $0.00 16.000 $6,800.00 100.00
<br /> $330.00 EACH 10.000 $3,300.00 0.000
<br /> 1240 GUIDANCE SIGN, 1-MODULE $0.00 11.000 $3,630.00 110.00
<br /> $2,200.00 EACH 13.000 $28,600.00 0.000
<br /> 1250 GUIDANCE SIGN, 2-MODULE $0.00 13.000 $28,600.00 100.00
<br /> S2,soo.oo EACH zs.ooo $62,soo.oo o.ooo
<br /> 1260 GUIDANCfi SIGN, 3-MODULE $0.00 25.000 $62,500.00 100.00
<br /> $3,200.00 EACH 18.000 $57,600.00 0.000
<br /> 1270 GUIDANCE SIGN, 4-MODULE ~ 50.00 19.000 $60,800.00 106.00
<br /> $3,700.00 EACH 23.000 $85,100.00 0.000
<br /> 1280 DISTANCE REMAINING SIGN $0.00 23.000 $8s,100.00 100.00
<br /> $3,100.00 EACH 5.000 $15,500.00 0.000
<br /> 1290 SPARE fiLECTRICAL EQUIPMENT $0.00 5.000 $15,500.00 100.00
<br /> $11,000.00 LUMPSUM 1.000 $11,000.00 0.000
<br /> 1300 BEACON UTILITY SBRVICE AND CON $0.00 0.000 $0.00 0.00
<br /> $6,500.00 LUMPSUM 1.000 $6,s00.00 0.000
<br /> 1310 L-829 AIRPIELD LIGHTING AND CO $0.00 1.000 $6,500.00 100.00
<br /> $160,000.00 LUMPSUM 1.000 $160,000.00 0.000
<br /> 1320 L-828 CCR SWITCHGEAR, IN PLACE $0.00 0.950 $1s2,000.00 95.00
<br /> $475,000.00 LUMPSUM 1.000 $475,000.00 0.000
<br /> 1330 NINDCONB LOCATION 1 $0.00 0.950 $451,250.00 95.00
<br /> $8,500.00 LIIMPBUN 1.000
<br /> 1340 $8,500.00 0.000 $0.00 2.000 $17,000.00
<br /> WINDCONB LOCATION 2 200.00
<br /> $8,500.00 LUNPSUM 1.000 $8,500.00 0.000
<br /> PHASE III $0.00 2.000 $17,000.00 200.00
<br />
<br /> 1350 MOBILIZATION AND DEMOBILIZATIO
<br /> $100,000.00 LUMPSUM 1.000 $100,000.00 0.000
<br /> $0.00 1.000 $100,000.00 100.00
<br />
<br />
|