<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 033
<br /> Contractor: WILDISH CONST. Original Contract: $16,589,175.71
<br /> Job 93-004183 Current Amount: $17,810,653.07
<br /> Contract No: 2004-00024 Contract Award Date: 06/07/2004
<br /> PO 2004100581 Completion Date: 10/15/2006
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals $ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 1880 REMOVE GUIDANCE 3I@7 AND PAD $185.00 EACH 28.000 $5,180.00 0.000 $0.00 53.000 $9,805.00 189.00
<br /> 1890 REMOVE AND REPLACE GUIDANCE SI $500.00 EACH 2.000 $1,000.00 0.000 $0.00 2.000 $1,000.00 100.00
<br /> 1900 ELECTRICAL NANflOLB $2,800.00 EACH 3.000 $8,400.00 0.000 $0.00 5.000 $14,000.00 167.00
<br /> 1910 MISCELLANEOUS SPARE ELECTRICAL $10,500.00 LUMPSUM 1.000 $10,500-00 0.000 $0.00 1.000 $10,500.00 100.00
<br /> PHASE ZV - ADDITIVE ALTBRNATH9 A 4 B
<br /> 1920 UPGRADE, NITL, L-816T, BASE MO $500.00 EACH 475.000 $237,500.00 0.000 $0.00 438.000 $219,000,00 92.00
<br /> 1930 5000 VOLT CABLE, N0.8 $1.00 LINPT 30,000.000 $30,000.00 850.000 $850-00 61,156.000 $61,156.00 204.00
<br /> 1940 L-823 CABLE 3PLZC83 $40.00 SACR 75.000 53,000.00 0.000 $0.00 427.000 $17,080.00 569.00
<br /> 1950 2" DUCT $2.50 LINFT 7,000.000 $17,500.00 0.000 $0.00 110.000 $275.00 2.00
<br /> 1960 DIRECTIONAL BORING CONDUIT $52.00 LINFT 1,500.000 $78,000.00 0.000 $0.00 2,265.000 $117,780.00 151.00
<br /> PHA38 III
<br /> 1970 PH1-CHANGE 2 ELEC. VAULTS 001 $1,012.00 EACH 2.000 $2,024,00 0.000 $0.00 2.000 $2,024.00 100.00
<br /> PHAS$ I
<br /> 1980 REPLACE 8" P-159 SUB-BASE-TAXI 002 $32,578.00 LUMPSUM 1.000 $31,578.00 0.000 $0.00 1.000 $31,578.00 100.00
<br /> P[fASB III
<br /> 1990 EWEB VAULT-ERE BUILDING 003 $5,796.00 LUMPSUM 1.000 $5,796.00 0.000 $0.00 1.000 $5,796.00 100.00
<br /> 2000 ELCTRICAL BUILDING 003 $2,422.00 LUMPSUM 1.000 $2,422.00 0.000 $0.00 1.000 $2,422.00 100.00
<br /> 2010 ADD GROUNDING TO EWEB VAULT 003 $240.00 EACH 9.000 $2,160.00 0.000 $0.00 9.000 $2,160.00 100.00
<br /> 2020 CONC ENCASEMENT ELEC CONDUIT U 003 $44,314.84 LUMPSUM 1.000 $44,314.84 0.000 $0.00 1.000 $44,314.84 100.00
<br /> 2030 BOCCIE CROSSING 003 $11,537.20 LUMPSUM 1.000 $11,537.20 0.000 $0.00 1.000 $11,537.20 100.00
<br /> 2040 INSTALL AC PATCH/SAN SWR LING 004 $8,036.00 LUMPSUM 1.000 $8,036.00 0.000 $0.00 1.000 $8,036.00 100.00
<br /> 2050 CREDIT FOR SANITARY SEWBR 004 ($1,700.00) LUMPSUM 1.000 ($1,700.00) 0.000 $0.00 1.000 ($1,700.00) 100.00
<br /> 2060 REWIRE SIGN CIRCUIT 004 $374.15 EACH 1.000 $374.15 0.000 $0.00 1.000 $374.15 100.00
<br /> 2070 UPGRADE GENERATOR 3001C9J FROM 2 005 $19,398.25 LIIMPSSM_. _ 1.000 $19,398.25 0.000 $0.00 1.000 $19,398.25 100.00