<br /> Run Date: 11/29/2005 16:36:44 Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No a 005 11na1 Pay <br /> Contractor: WILDISH CONST. Original Contract: $318,414.70 <br /> Job 93-004195 Nrreat Amount: $335,844.81 <br /> Contract No: 2005-00021 Contract Award Date: 04/07/2005 <br /> PO 2005050414 Camplet ion Date: 06/30/2005 <br /> Aaeeaeable: No <br /> Curren[ Contract Estimated Payment Cumulative Totals t Casple[e <br /> <br /> Line Description Last Chag Ord Unit Price Unit Measure Quaat ity Amount Quantity Amount antit Amount <br /> <br /> PPP 2005 - N. 18 TN PROM lAIBNDLY TO CITY VIBN <br /> Seth Avenue from blandly to C1 Cy Vlew <br /> 0000 Liquidated Damages ($310.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0 00 0.00 <br /> 0010 MOBILIZATION 529,000.00 LVMPSUM 1.000 $29,000.00 0.000 $0.00 1.000 $29,000.00 100.00 <br /> 0020 THMPORARY WORE ZONE TRAPFIC CO $11,000.00 LUMPSVM 1.000 $11,000.00 0.000 $0.00 1.000 $11,000.00 100.00 <br /> 0030 HROSION CONTROL $3,300.00 LUMPSUM 1.000 $3,300.00 0.000 $0.00 1.000 $3,300.00 100.00 <br /> 0040 FLAGGING, POLICH $65.00 HOUR 50.000 $3,250.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0050 PLAOGINO $36.00 NODR 500.000 $18,000.00 0.000 $0.00 633.000 $23,788.00 127.00 <br /> 0060 CITY PROVIDED SPEC INPO SIGNS 001 $275.00 EACH 6.000 $1,650.00 0.000 $0.00 6.000 $1,650.00 100.00 <br /> 0070 LEVEL Z, 1/2 IN DBNSH HMAC $36.50 TON 1,646.000 $60,079.00 0.000 $0.00 1,679.710 $61,309.42 M 102.00 <br /> 0080 LBVBL 1, 3/4 IN DC48B BMAC $45.00 TON 218.000 89.810.00 0.000 $0.00 300.130 533,505.40 138.00 <br /> 0090 LBVHL 3, 1/3 IN DHNSB HMAC $39.00 TON 1,386.000 $54,054.00 0.000 $0.00 1,553.640 $60,591.96 M 112.00 <br /> 0100 LHVEL 3, 3/4 IN DHNSB HMAC $36.00 TON 515.000 $19,570.00 0.000 $0.00 298.820 $10,975.16 56.00 <br /> 0110 COLD PLANE PVMT RBMOVAL 0-2 I $0.25 SQFT 85 415.000 $21,353.75 0.000 $0.00 90,146.750 $22,536.69 106.00 <br /> 0120 PAVHMHNT RHMOVAL $0.70 SQPT 17,728.000 $12,409.60 0.000 $0.00 11,377.500 $7,964.25 64.00 <br /> 0130 SURFACING STABILIZATION $52.00 CVYD 468.000 $24,336.00 0.000 $0.00 408.240 $21,228.48 97.00 <br /> 0140 THMPORARY STRIPING $600.00 LUMPSUM 1.000 $600.00 0.000 $0.00 1.000 $600.00 100.00 <br /> 0150 THERMOPAST, NON-PROF, 120 MIL, $18,000.00 LUMPSUM 1.000 $18,000.00 0.000 $0.00 1.000 $1e,000.00 100.00 <br /> 0160 PVMT LEGEND, TYPB A-lor A-2: B $110.00 EACH 4.000 $440.00 0.000 $0.00 4.000 $440.00 100.00 <br /> 0170 PAVEMENT LINfi TYPE A-1 or A-2 $3.00 SQPT 265.000 $795.00 0.000 $0.00 290.000 $870.00 109.00 <br /> <br />