Run Date: 03/15/2005 14:51:48 Page 1 <br /> City of Eugene <br /> ,s Bid Tabulation <br /> Bid 2005-000003 <br /> Job No ~f93-004195 <br /> Column/Row: 1/1 <br /> ENGINEER'S ESTIMATE <br /> Line No. Description Quantity Unit Unit Price Amount <br /> PPP 2005 - W. 28TH FROM FRIENDLY TO CITY VIEW - Contract <br /> 28th Avenue from Friendly to City View <br /> 0010. MOBILIZATION 1 LUMPSUM $27,000.00 $27,000.00 <br /> 0020. TEMPORARY WORK ZONE TRAFFIC CONTROL COMPLETE 1 LUMPSUM $2,500.00 $2,500.00 <br /> 0030. EROSION CONTROL 1 LUMPSUM $2,000.00 $2,000.00 <br /> 0040. FLAGGING, POLICE 50 HOUR $75.00 $3,750.00 <br /> 0050. FLAGGING 500 HOUR $32.00 $16,000.00 <br /> 0060. CITY PROVIDED SPEC INFO SIGNS 4 EACH $450.00 $1,800.00 <br /> 0070. LEVEL 2, 1/2 IN DENSE HMAC 1646 TON $32.00 $52,672.00 <br /> 0080. LEVEL 2, 3/4 IN DENSE HMAC 218 TON $52.00 $11,336.00 <br /> 0090. LEVEL 3, 1/2 IN DENSE HMAC 1386 TON $40.00 $55,440.00 <br /> 0100. LEVEL 3, 3/4 IN DENSE HMAC 515 TON $50.00 $25,750.00 <br /> 0110. COLD PLANE PVMT REMOVAL, 0-2 IN DEEP 85415 SQFT $0.20 $17,083.00 <br /> 0120. PAVEMENT REMOVAL 17728 SQFT $1.10 $19,500.80 <br /> 0130. SURFACING STABILIZATION 468 CUYD $56.00 $26,208.00 <br /> 0140. TEMPORARY STRIPING 1 LUMPSUM $2,500.00 $2,500.00 <br /> 0150. THERMOPAST, NON-PROF, 120 MIL, SPRAYED 1 LUMPSUM $15,000.00 $15,000.00 <br /> 0160. PVMT LEGEND, TYPE A-lor A-2: BICYCLE LANE SYM 4 EACH $200.00 $800.00 <br /> 0170. PAVEMENT LINE, TYPE A-1 or A-2 265 SQFT $7.00 $1,855.00 <br /> 0180. LOOP DETECTOR INSTALLATION 1 LUMPSUM $3,750.00 $3,750.00 <br /> 0190. BI-DIR YELLOW TYPE 1 MARKER 204 EACH $4.00 $816.00 <br /> 0200. MONO-DIR CRYSTAL TYPE 1 MARKER 67 EACH $4.00 $268.00 <br /> 0210. ADJUST MANHOLES 28 EACH $800.00 $22,400.00 <br /> 0220. 10 INCH PIPE 51 LINFT $55.00 $2,805.00 <br /> 0230. CONCRETE CLOSURE COLLARS 3 EACH $500.00 $1,500.00 <br /> 0240. ADJUST VALVE BOXES 8 EACH $250.00 $2,000.00 <br /> 0250. MH REM/REPL FRAME/COVER-WW 2 EACH $300.00 $600.00 <br /> 0260. MH REM/REPL FRAME/COVER-STM 2 EACH $300.00 $600.00 <br /> Total 28th Avenue from Friendly to City View $315,933.80 <br /> Total PPP 2005 - W. 28TH FROM FRIENDLY TO CITY VIEW - Contract $315,933.80 <br /> <br /> I <br /> <br />