<br /> Run Date: 09/02"4 09:50:02 City of gene ~v <br /> Engineer' ~timate <br /> Estimate: Bid Time <br /> Job 93-004193 FERRY STREET BRIDGE RHPAIRS OVER WILLAMETTE RIVER <br /> Line No. Description Quantity Unit Unit Price Amount <br /> FERRY STREET BRIDGE REPAIRS OVER WILLAMETTE RIVER <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $67,000.00 $67,000.00 <br /> 0020. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $13,000.00 $13,000.00 <br /> 0030. CRACK INJECTION 2,000.00 FOOT $22.75 $45,500.00 <br /> 0040. FRP STRENGTHENING 1.00 LUMPSUM $140,000.00 $140,000.00 <br /> Total General $265,500.00 <br /> Total FERRY STRESf BRIDGE REPAIRS OVER WILLAMETTE RIVER $265,500.00 <br /> FERRY STREET BRIDGB REPAIRS OVER WILLAMETTE RIVER - Other / Direot <br /> General <br /> 0010. test 2~ of Contract $5,310.00 <br /> 0020. Contingency 25~ of Contract $66,375.00 <br /> 0030. Consultants 1.OD LUMPSUM $140,000.00 $140,000.00 <br /> Total :General $211,685.00 <br /> Total FERRY STREET BRIDGB REPAIRS OVER WILLAMETTE RIVER - Other / Direct $211,685.00 <br /> FERRY 3TREET BRIDGE REPAIRS OVER WILLAMETTE RIVER - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $15,000.00 $15,000.00 <br /> 0020. ODOT admin costs 1.00 LUMPSUM $15,000.00 $15,000.00 <br /> Total General $30,000.00 <br /> Total FERRY STREET BRIDGE REPAIRS OVER WILLAMETTE RIVER - Miscellaneous $30,000.00 <br /> Total Bid Time $507,185.00 <br /> <br />