<br /> Ferry St. Bridge Crack Repair <br /> <br /> OBEC Consulting Engineers March 2, 2004 <br /> Proj Mgr / Sr. Prof Proj Sr. Proj Engr/ Sr. CADD CADD Asst Const Sr. Eng. Eng. Tech TOTAL TONAL <br /> TASK Principal Team Clerical TASK PHASE <br /> Loader Engr Engr Spec Engr Tech Tech It Engr. Tech 2 HOURS AMOU~lT <br /> Phase 1 Immediate Re irs <br /> 1 P <br /> 1. ro ect Mana ement <br /> 8 8 4 20 <br /> 1.2 Ins coon S na 1, 5, & 8 1 8 8 17 <br /> 1.3 Re-load rafin w/ 90% shear ca a ' 18 16 <br /> 1.4 Develo Limited Bid Documents 2 4 18 4 8 4 38 <br /> 1.5 Assist Ci w/ Biddin 2 2 2 6 <br /> 1.6 Construction Ins ~on 8 40 40 8 96 <br /> 1.7 Re-Inspections 4 4 32 36 <br /> Task Subtotal 16 12 34 4 10 0 0 9 80 48 16 229 20,127.00 <br /> Phase 2 Desl n En ineerin . <br /> 2.1 Pro'ect Mana ement 8 12 4 24 <br /> 2.2 Investi ate Repair O lions 4 12 80 18 112 <br /> 2.3 ost Estimates 2 2 18 8 28 <br /> 2.4 Prepare Prelimina Report 2 24 4 16 18 8 70 <br /> 2.5 Prelimina Review Meetin w/ i 4 4 4 12 <br /> 2.6 Prepare Advance tans 8 S ifications (90% 2 4 120 80 16 96 48 346 <br /> 2.7 Prepare final Plans and ifications 2 2 32 12 4 16 B 76 <br /> 2.8 Assist w/ Biddin 2 2 4 2 10 <br /> 0 <br /> Task Subtotal 24 40 280 100 22 128 72 0 0 0 12 678 59,192.00 <br /> Phase 3 Construction En ineerin . <br /> 0 <br /> Task Subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0.00 <br /> 0 <br /> TOTAL HOURS 40 52 314 104 32 128 72 9 80 48 28 907 <br /> CONTRACT HOURLY RATES $130.00 $118.00 $98.00 $90.00 $98.00 $83.00 $57.00 $95.00 $90.00 $85.00 $49.00 79,319.00 <br /> TOTAL LABOREST/MATE $5,200 $6,136 $30,772 $9,360 $3,136 $8,084 $4,104 $855 $7,200 $3,120 51,372 $79,319 <br /> OBEC EXPENSES TOTAL EXPENSES $1,750 <br /> TOTAL OBEC ESTIMATE $81,069 <br /> Re reduction Haas 5200 <br /> Boom Litt nse 51000 ~ <br /> Milea a $50 <br /> Traffic Control i500 <br /> TOTAL ESTIMATE $81,100 <br /> u <br /> a <br /> <br />