! ' <br /> Ferry St. Bridge Shear Crack Repair <br /> OBEC Consulting Engineers <br /> OBEC Job No. 89-71 <br /> For Professional Services throu h riod endin Au ust 14, 2004 <br /> Total This <br /> Dri final Previous Period To Date Remain. Budget <br /> <br /> TASK DESCRIPTI{3N Amount- Amount Amount Amount Amount com ~e <br /> Phase 1 Immediate Re airs 20,127 6,097.50 118.00 6,215.50 13,911.50 30.9% <br /> Phase 2 Desi n En ineerin 59,192 18,481.00 8,527.50 27,008.50 32,183.50 45.6% <br /> Phase 3 Construction En ineerin 0 0.00 0.00 0.00 <br /> Subtotal 79,319 24,578.50 8,645.50 33,224.00 46,095.00 41.9% <br /> Ex enses 1,781 312.33 14.64 326.97 1,454.03 18.4% <br /> TOTAL NOT-TO-EXCEED 81,100 24,890.83 8,660.14 33,550.97 47,549.03 41.4% <br /> <br />