I ~ CONSULTING <br /> ~ ENGINEERS <br /> Transportation • Structural • Civil • Surveying • Inspection • Environmental <br /> DFe ~ <br /> December 27, 2004 9 2~D4 <br /> Steve Gallup, P.E. <br /> City of Eugene Public Works <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> RE: Ferry St. Bridge Shear Crack Repair <br /> OBEC Job No. 89-71 <br /> In accordance with Contract #2004-00239 we submit the following short narrative report to <br /> accompany the enclosed progress billing: <br /> Date of Authority to Proceed with Engineering April 28, 2004 <br /> Contract Expiration Date December 31, 2004 <br /> Ending Date for Enclosed Progress Billing December 18, 2004 <br /> Date of Enclosed Invoice December 27, 2004 <br /> Enclosed Invoice Number 19425 <br /> Amount of this Progress Billing $ 8,606.95 <br /> Total Billing Including This Invoice $ 93,735.08 <br /> Total Authorization per Consultant Agreement $122,800.00* <br /> *Includes Amendment No. 1 for CE ($41,700) <br /> Description of Engineering Services performed by consultant during this billing period: <br /> • Project coordination. <br /> • Load rating check on Ferry Street Bridge <br /> • On-site inspection <br /> Sincerely, <br /> Gayle D. Harley, P.E. <br /> President & Chief Construction Engineer <br /> GDH/sah <br /> Enclosure <br /> <br /> SALEM EUGENE -Corporate Office MEDFORD <br /> (503) 589-4100 (541) 683-6090 (541) 774-5590 <br /> FAX (503) 589-4141 FAX (541) 683-6576 FAX (541) 774-5591 <br /> 2235 Mission Street SE, Suite 100 920 Country Club Road, Suite 1008 1335 Poplar Drive <br /> Salem, Oregon 97302-1295 Eugene, Oregon 97401-6089 Medford, Oregon 97504 5207 <br /> www.obec.com <br /> <br />