R <br /> Date: 07/ '006 15:00:29 City Eugene <br /> Estimat atribution <br /> Estimate: 40th Ave; Donald to Willamette-ES <br /> r. <br /> Job 93-004205 40TH AVS; DONALD-WILLAMSTTS PPp <br /> Line No. Description <br /> Quantity Unit Unit Price Amount <br /> 40TH AVS; DONALD-iPILLAM8TT8 PPP <br /> General <br /> 0190. MOBILIZATION 1.00 LUMPSUM $8,000.00 $8,000.00 <br /> 0200. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0210. TEMPORARY STRIPING 1.00 LUMPSUM $700.00 $700.00 <br /> 0220. FLAGGERS 250.00 HOUR $40.00 $10,000.00 <br /> 0230. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $150.00 $600.00 <br /> 0240. EROSION CONTROL 1.00 LUMPSUM $800.00 $800.00 <br /> 0250. 10 INCH PVC PIPE 38.00 FOOT $125.00 $4,750.00 <br /> 0260. ADJUSTING BOXES 4.00 EACH $200.00 $800.00 <br /> 0270. MINOR ADJUSTMENT OF MANHOLES 1.00 EACH $1,000.00 $1,000.00 <br /> 0280. MH REM/REPL FRAME/COVER-ST 1.00 EACH $240.00 $240.00 <br /> 0290. COLD PLANE PVMT REMOVAL, 0" TO 2" DEEP 18,180.00 SQFT $0.34 $6,181.20 <br /> 0300. COLD PLANE PVMT REMOVAL, 3" DEEP 840.00 SQFT $1.37 $1,150.80 <br /> 0310. PAVEMENT REMOVAL 8,800.00 SQFT $0.95 $8,360.00 <br /> 0320. LEVEL 2, 1/2" DENSE HMAC 575.00 TON $53.50 $30,762.50 <br /> 0330. LEVEL 2, 3/4" DENSE HMAC 340.00 TON $73.50 $24,990.00 <br /> 0340. PVMT LINE, TYPE Al OR A2 36.00 SQFT $4.50 $162.00 <br /> 0350. BI-DIRECTIONAL YELLOW TYPE I MARKERS 35.00 EACH $5.00 $175.00 <br /> 0360. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1.00 LUMPSUM $2,200.00 $2,200.00 <br /> Total General $105,871.50 <br /> Total 40TH AVS; DONALD-WILLAMETTE PPP $105,871.50 <br /> 40TH AVS; DONALD-WILLAMSTT$ PPP - Other / Direct <br /> General <br /> 0010. CONTINGENCY 10~ of Contract $10,587.15 <br /> 0020. PAVEMENT TESTING 2~ of Contract $2,117.43 <br /> 0030. Advertising 1.00 LUMPSUM $200.00 $200.00 <br /> 0040. Printing 1.00 LUMPSUM $500.00 $500.00 <br /> Total General $13,404.58 <br /> Total 40TH AVB; DONALD-WILLAM8TT13 PPP - Other / Direct $13,404.58 <br /> 40TH AV$; DONALD-WILLAMBTTH PPP - Miscellaneous <br /> General <br /> 0010. Engineering Charge 28.5 of Direct $33,993.68 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General $34,781.68 <br /> Total 40TH AVL; DONALD-WILLAM8TT8 PPP - Miscellaneous $34,781.68 <br /> <br /> Total 40th Ave; Donald to Willamette-ES $154,057.76 <br /> <br />