Run Date: 01/17/2007 11:42:07 City of Eugene <br /> Estimate Distributiop <br /> Estimate: 40th Ave; Donald to Willamettte-FP <br /> Job 93-004205 40TH AVS; DONALD-WILLANSTTS PPP <br /> Line. NO. Description Quantity Unit Unit Price Amount <br /> 40TH AVS; DONALD-WILLAMSTTS PPP <br /> General <br /> 0190. MOBILIZATION 1.00 LUMPSUM $8,000.00 $8,000.00 <br /> 0200. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0210. TEMPORARY STRIPING 1.00 LUMPSUM $700.00 $700.00 <br /> 0220. FLAGGERS 97.50 HOUR $40.00 $3,900.00 <br /> 0230. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $150.00 $600.00 <br /> 0240. EROSION CONTROL 1.00 LUMPSUM $800.00 $800.00 <br /> 0250. 10 INCH PVC PIPE 0.00 FOOT $125.00 $0.00 <br /> 0260. ADJUSTING BOXES 1.00 EACH ~ $200.00 $200.00 <br /> 0270. MINOR ADJUSTMENT OF MANHOLES 1.00 EACH $1,000.00 $1,000.00 <br /> 0280. MH REM/REPL FRAME/COVER-ST 1.00 EACH $240.00 $240.00 <br /> 0290. COLD PLANE PVMT REMOVAL, 0" TO 2" DEEP 17,022.00 SQFT $0.34 $5,787.48 <br /> 0300. COLD PLANE PVMT REMOVAL, 3" DEEP 3,270.00 SQFT $1.37 $4,479.90 <br /> 0310. PAVEMENT REMOVAL 8,874.00 SQFT $0.95 $8,430.30 <br /> 0311. SURFACE STABILIZATION-40TH 001 33.61 CUYD $95.00 $3,192.95 <br /> 0320. LEVEL 2, 1/2" DENSE HMAC 625.69 TON $53.50 $33,474.42 <br /> 0321. LEVEL 2, 1/2" HMAC PRICE-40TH 001 625.69 TON $3.21 $2,008.46 <br /> 0330. LEVEL 2, 3/4" DENSE HMAC 355.12 TON $73.50 $26,101.32 <br /> 0331. LEVEL 2, 3/4" HMAC PRICE ADJ-40TH 001 355.12 TON $3.21 $1,139.94 <br /> 0340. PVMT LINE, TYPE Al OR A2 32.50 SQFT $4.50 $146.25 <br /> 0350. BI-DIRECTIONAL YELLOW TYPE I MARKERS 37.00 EACH $5.00 $185.00 <br /> 0360. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1.00 LUMPSUM $2,200.00 $2,200.00 <br /> Total General <br /> Total 40TH AVS; DONALD-WILLANSTTB PPP $107,586.02 <br /> $107,586.02 <br /> 40TH AVS; DONALD-WILLAMETTE PPP - Other / Direct <br /> General <br /> 0010. CONTINGENCY 0~ of Contract $0.00 <br /> 0030. Advertising 1.00 LUMPSUM $151.32 $151.32 <br /> 0040. Printing 1.00 LUMPSUM $273.40 $273.40 <br /> 0050. PAVEMENT TESTING 1.00 EACH $230.00 $230.00 <br /> 0060. test 1.00 LUMPSUM $679.00 $679.00 <br /> Total General <br /> Total 40TH AVS; DONALD-WILLAMETTE PPP - Other / Direct $1,333.72 <br /> $1,333.72 <br /> 40TH AVS; DONALD-WILLAMETTE PPP - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $27,676.12 $27,676.12 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General <br /> Total 40TH AVS; DONALD-WILLAMETTE PPP - Miscellaneous $28,464.12 <br /> $28,464.12 <br /> <br /> Total 40th Ave; Donald to Willamettte-FP $137,383.86 <br /> <br />