<br /> Run Date: 06/17/2005 09:23:51 City of Eugene <br /> Engineer's Estimate <br /> Estimate: 11th Ave; Pearl -to Charneltn-- MBi _ _ _ <br /> Job 93-004203 11TH AVS PPP-FROM PEARL TO CHARNELTON <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 11TH AVE PPP-FROM PEARL TO CHARNELTON <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $14,250.00 $14,250.00 <br /> 0020. TEMPORARY WORK ZONE TRAFFIC CONTROL COMPLETE 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> 0040. CITY PROVIDED SPEC INFO SIGNS 3.00 EACH $200.00 $600.00 <br /> 0050. SEQUENTIAL ARROW SIGNS 2.00 EACH $500.00 $1,000.00 <br /> 0060. FLAGGING 300.00 HOUR $48.00 $14,400.00 <br /> 0070. POLICE FLAGGING 100.00 HOUR $65.00 $6,500.00 <br /> 0080. COLD PLANE PVMT REMOVAL, 2 IN DEEP 10,850.00 SQFT $0.45 $4,882.50 <br /> 0090. COLD PLANE PVMT REMOVAL, 4 IN DEEP 50,216.00 SQFT $0.45 $22,597.20 <br /> 0100. PAVEMENT REMOVAL 4,291.00 SQFT $0.75 $3,218.25 <br /> 0110. "BRICK RED" REINFORCED CONCRETE PAVEMENT 70.00 SQYD $130.00 $9,100.00 <br /> 0120. LEVEL 3, 1/2 IN DENSE HMAC 817.00 TON $38.00 $31,046.00 <br /> 0130. LEVEL 3, 3/4 IN DENSE HMAC 804.00 TON $38.00 $30,552.00 <br /> 0140. THERMOPLAST, NON-PROF, 120 MIL, SPRAYED 1.00 LUMPSUM $3,700.00 $3,700.00 <br /> 0150. TEMPORARY STRIPING 1.00 LUMPSUM $250.00 $250.00 <br /> 0160. LOOP DETECTOR INSTALLATION 1.00 LUMPSUM $3,000.00 $3,000.00 <br /> 0170. PVMT LEGEND, TYPE Al or A-2: ARROWS 12.00 EACH $75.00 $900.00 <br /> 0180. PVMT LEGEND, TYPE Al or A-2: BICYCLE LANE SYM 3.00 EACH $90.00 $270.00 <br /> 0190. PVMT LEGEND, TYPE B: PARKING STRIPE 18.00 EACH $25.00 $450.00 <br /> 0200. PVMT LEGEND, TYPE B: PVMT LINE EXTENSION 2.00 EACH $150.00 $300.00 <br /> 0210. PVMT LEGEND, TYPE B: BLUE STRIPING 1.00 EACH $1,450.00 $1,450.00 <br /> 0220. PVMT LINE, TYPE Al or A-2: 780.00 SQFT $2.85 $2,223.00 <br /> 0230. MONO-DIR CRYSTAL TYPE 1 MARKER 98.00 EACH $2.70 $264.60 <br /> 0240. ADJUST MANHOLES 19.00 EACH $800.00 $15,200.00 <br /> 0250. ADJUST VALVE BOXES 21.00 EACH $275.00 $5,775.00 <br /> 0260. C900 8" PVC PIPE 50.00 FOOT $85.00 $4,250.00 <br /> 0270. REM/REPL CURB AND GUTTER 15.00 FOOT $67.00 $1,005.00 <br /> 0280. REM/REPL CATCH BASIN & GRATE 1.00 EACH $1,943.79 $1,943.79 <br /> Total General $190,127.34 <br /> Total 11TH AVS PPP-FROM PEARL TO CHARNELTON $190,127.34 <br /> 11TH AVE PPP-FROM PEARL TO CHARNELTON - Other / Direct <br /> General <br /> 0010. PAVEMENT TESTING 2~ of Contract $3,802.55 <br /> 0020. Contingency 10~ of Contract $19,012.73 <br /> 0030. Advertising 1.00 LUMPSUM $350.00 $350.00 <br /> Total General $23,165.28 <br /> Total 11TH AV8 PPP-FROM PEARL TO CHARNELTON - Other / Direct $23,165.28 <br /> 11TH AVE PPP-FROM PEARL TO CHARNSLTON - Miscellaneous <br /> General ' <br /> 0010. Engineering Charge 19~ of Direct $40,525.60 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General $41,313.60 <br /> Total 11TH AVE PPP-FROM PEARL TO CHARNELTON - Miscellaneous $41,313.60 <br /> Total 11th Ave; Pearl to Charneltn - MBI $254,606.22 <br /> s <br /> r <br /> , ~ ~ ~ r <br /> <br />