<br /> Billable Project Costs As Of 07/31 /2005 <br /> 08/26200 1202:19 PM Page 2 of 71 <br /> Project Billed Acli- Total Amount Billed <br /> Billed B~ vi TranDate Tranld Resource Employed uanti $Amount OperOvhd AdmOvhd Transaction Remark <br /> 0408 West 11th (4203) $1,363.46 $1,816.57 $3,180.03 <br /> 3636213 Materials Testing $1,363.46 $1,816.57 53,180.03 <br /> 286C Asphaltic concrete quality control (CE) 81,079.61 51,422.29 52,501.91 <br /> 07/23!2005 fl3560041 Engineering Technician 2 7S L-H $260.10 $377.25 ac samples &dfs <br /> 07/23/2005 fl3560041 PASSENGER VANS 7.5 H $45 00 ac samples &dfs <br /> 07/23/2005 f61930011 Engneer-ln-Training 5.5 L-H $11160 $16L86 AC Testing <br /> 07/24/2005 fl356005Z Engineering Teclnician 2 9 L-H $416.16 $603.60 ac testing <br /> 07/24/2005 fl3560052 PASSENGER VANS 9 H $54.00 ac testing <br /> 07/24/2005 f61930012 Engineer-In-Training 9.5 L-H $192.76 $279.58 AC Testing <br /> 287C PCC quality control (CE) 5121.32 8175.96 8297.18 <br /> 07/20/2005 e61930085 Engineer-In-Training 2 L-H $40.58 $58.86 PCC testing <br /> 07/20/2005 e71570045 Extra Help 2 L-H $20.08 $29.12 concrete cylinder testing, slump and air <br /> 07/22/2005 e61930087 Engineer-In-Training 2 L-H $40.58 $58.86 PCC testing <br /> 07/22/2005 e71570047 Extra Help 2 L-H $20.08 $29.12 concrete cylinder testing, slump and air <br /> 322-6 Asphalt sample pickup $121.94 $159.46 5281.40 <br /> 07/23/2005 fl 3560031 Engineenng Teclnician 2 2 L-H $69.36 $100.60 p/u ac sample <br /> 07/23/2005 (13560031 PASSENGER VANS 2 H $12.00 p/u ac sample <br /> 07/24/2005 f619300Z2 Engineer-In-Training 2 L-H $40.58 $58.86 ac sample pickup <br /> 322-7 Concrete sample pickup 840.58 558.86 899.44 <br /> 07/21/2005 e61930106 Engineer-In-Training I L-H $20.29 $29 43 Concrete sample pickup <br /> 07/23/2005 f61930061 Engineer-In-Training I L-H $20.29 $29 43 Concrete sample pickup <br /> t~ <br /> s <br /> i <br /> <br />