Run Date: 12/0 06 12:44:23 City of Eugene
<br /> Estimate ribution ~
<br /> 1
<br /> Estimate: Chambers; 8th to 11th -ES Final Pay
<br /> Job 93-004201 CHAMBSRS:BTH TO 11TH, PAVSMSNT PRSSSRVATION
<br /> Line No. Description Quantity Unit Unit Price Amount
<br /> CHAMSSRS:BTH TO 11TH, PAVSMSNT PRSSSRVATION
<br /> General
<br /> 0010. MOBILIZATION 1.00 LUMPSUM $20,000.00 $20,000.00
<br /> 0020. TEMPORARY WORK ZONE TRAFFIC CONTROL COMPLETE 1.00 LUMPSUM $4,000.00 $4,000.00
<br /> 0030. EROSION CONTROL 1.00 LUMPSUM $1,000.00 $1,000.00
<br /> 0040. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $150.00 $600.00
<br /> 0050. POLICE FLAGGING 54.00 HOURS $65.00 $3,510.00
<br /> 0060. FLAGGING 160.00 HOUR $1.00 $160.00
<br /> 0070. PAVEMENT REMOVAL 23,730.00 SQFT $0.60 $14,238.00
<br /> 0080. COLD PLANE PVMT REMOVAL, 0-2 IN DEEP 13,490.00 SQFT $0.45 $6,070.50
<br /> 0090. LEVEL 3, 1/2 IN DENSE HMAC 606.32 TON $50.00 $30,316.00
<br /> 0100. LEVEL 3, 3/4 IN DENSE HMAC 953.14 TON $50.00 $47,657.00
<br /> 0110. TEMPORARY STRIPING 1.00 LUMPSUM $2,000.00 $2,000.00
<br /> 0120. THERMOPLAST, NON-PROF, 120 MIL, SPRAYED 1.00 LUMPSUM $4,500.00 $4,500.00
<br /> 0130. LOOP DETECTOR INSTALLATION 0.90 LUMPSUM $7,600.00 $6,840.00
<br /> 0140. PVMT LEGEND, TYPE Al or A-2: ARROWS 2.00 EACH $80.00 $160.00
<br /> 0150. PVMT LEGEND, TYPE Al or A-2: BICYCLE LANE SY 4.00 EACH $90.00 $360.00
<br /> 0160. PVMT LINE, TYPE Al or A-2: 419.00 SQFT $3.00 $1,257.00
<br /> 0170. BI-DIR YELLOW TYPE 1 MARKER 50.00 EACH $3.00 $150.00
<br /> 0180. MONO-DIR CRYSTAL TYPE 1 MARKER 5.00 EACH $3.00 $15.00
<br /> 0190. ADJUST MANHOLES 11.00 EACH $800.00 $8,800.00
<br /> 0200. ADJUST VALVE BOXES 11.00 EACH $200.00 $2,200.00
<br /> 0210. MH REM/REPL FRAME/COVER-WW 11.00 EACH $230.00 $2,530.00
<br /> Total General $156,363.50
<br />
<br /> Total CHAI~SR3:8TH TO 11TH, PAVSMSNT PRSSSRVATION
<br /> $156,363.50
<br /> CHAI~SRS:BTH TO 11TH, PAVSMBYiT PRESERVATION - Other / Direct
<br /> General
<br /> 0010. Advertising 1.00 LUMPSUM $401.48 $401.48
<br /> 0030. PAVEMENT TESTING 1.00 EACH $1,889.91 $1,889.91
<br /> 0040. CONTINGENCY 0.00 LUMPSUM $0.00 $0.00
<br /> 0050. Printing 1.00 LUMPSUM $78.00 $78.00
<br /> Total General $2,369.39
<br /> Total CHAMSSRS:8TH TO 11TH, PAVSMSNT PRSSSRVATION - Other / Direct $2,369.39
<br />
<br /> CHAMHSRS:BTH TO 11TH, PAVSMBNT PRSSSRVATION - Miscellaneous
<br /> General
<br /> 0010. Engineering Charge 1.00 LUMPSUM $28,287.90 $28,287.90
<br /> 0030. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $0.00 $0.00
<br /> Total General $28,287,90
<br />
<br /> Total CHAMBSR5:8TH TO 11TH, PAVSMSNT PRSSSRVATION - Miscellaneous $28,287.90
<br />
<br /> Total Chambers; 8th to 11th -ES Final Pay $187,020.79