New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4222
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 11:31:30 AM
Creation date
6/24/2008 10:02:38 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
004222
GL_Project_Number
945332
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> t <br /> Garden Way Bike Path Pavement Preservation <br /> (Garden Way to Canoe Canal) <br /> Preliminary Cost Estimate <br /> GJN: 4222 <br /> June 4, 2004 <br /> Funding Source: Trans SDC <br /> Scope Project and Develop Site Drawing: <br /> Associate Engineering Technician 30hrs x $67/hr.=$2,010 <br /> Civil Engineer I 15hrs x $77/hr.= 1 155 <br /> Total =$3,165 <br /> Project Prospectus: <br /> to Include -compilation of information and draft Project Prospectus <br /> -submission and tracking of Project Prospectus through ODOT <br /> -Initiation and development of the IGA with ODOT <br /> Associate Engineering Technician 25hrs x $67/hr.=$1,675 <br /> Civil Engineer I 60hrs x $77/hr.= 4 620 <br /> Total =$6,295 <br /> Total Costs This Estimate= $3,165 + $6295= 9 460 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.