<br /> t <br /> Garden Way Bike Path Pavement Preservation <br /> (Garden Way to Canoe Canal) <br /> Preliminary Cost Estimate <br /> GJN: 4222 <br /> June 4, 2004 <br /> Funding Source: Trans SDC <br /> Scope Project and Develop Site Drawing: <br /> Associate Engineering Technician 30hrs x $67/hr.=$2,010 <br /> Civil Engineer I 15hrs x $77/hr.= 1 155 <br /> Total =$3,165 <br /> Project Prospectus: <br /> to Include -compilation of information and draft Project Prospectus <br /> -submission and tracking of Project Prospectus through ODOT <br /> -Initiation and development of the IGA with ODOT <br /> Associate Engineering Technician 25hrs x $67/hr.=$1,675 <br /> Civil Engineer I 60hrs x $77/hr.= 4 620 <br /> Total =$6,295 <br /> Total Costs This Estimate= $3,165 + $6295= 9 460 <br /> <br />