<br /> • May 18, 2004 <br /> Preliminary Cost Estimate for: North Ridge Bike Path <br /> GJN: 4221 <br /> Funding Source: Trans SDC <br /> Scope project and develop site drawing - $9,450 <br /> Engineering Technician 30 hrs x $67/hr. _ $2,010 <br /> Engineering Associate 15 hrs x $77/hr. = 1 155 <br /> Total = $3,155 <br /> Project Prospectus - $9,165 <br /> to include -compile information & draft Project Prospectus <br /> - submit and track Project Prospectus through ODOT <br /> - initiate and develop IGA with ODOT <br /> Engineering Technician 25 hrs x $67/hr. _ $1,675 <br /> Engineering Associate 60 hrs x $77/hr. = 4 620 <br /> Total = $6,295 <br /> Total costs - $3,155 + $6,295 = $9,450 <br /> <br />