<br /> Apn18, 2004 <br /> <br /> Preliminary Cost Estimate for: Fern Ridge Bike Path reconstruction <br /> <br /> GJN: 4220 <br /> Funding Source: Trans SDC <br /> Scope project and develop site drawing - $3,165 <br /> Engineering Technician 30 hrs x $67/hr. _ $2,010 <br /> Engineering Associate 15 hrs x $77/hr. = 1 155 <br /> Total = $3165 <br /> Project Prospectus - $9,165 <br /> to include -compile information & draft Project Prospectus <br /> - submit and track Project Prospectus through ODOT <br /> - initiate and develop IGA with ODOT <br /> Engineering Technician 50 hrs x $67/hr. _ $3,390 <br /> Engineering Associate 75 hrs x $77/hr. = 5 775 <br /> Total = $9165 <br /> Total costs - $3,165 + $9,165 = $12,330 ~ ~ 5~ d 0 ~ <br /> <br />