New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4232 Eugene Springfield Metro Waterways Study
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4232 Eugene Springfield Metro Waterways Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:57:41 PM
Creation date
6/23/2008 3:44:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004232
GL_Project_Number
945136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fabric affecting the health of area waterways. This baseline data work will represent a <br /> <br /> major share of study work and costs in the FY 04-05. We expect to complete-ter make <br /> substantial progress toward completion of-our baseline work in this timeframe. As with <br /> the specific planning parameters (#1 above), this information is a foundation for <br /> assessing and formulating alternative answers to the issues/problems the study seeks to <br /> address; it too is revisited as study discoveries/needs dictate. <br /> 3. We will begin generating alternative plans. To a large degree, this work must await <br /> and be based on the planning parameters (#1 above) and the baseline conditions (#2 <br /> above). But in the meantime, we will be able to begin development of the tools we need <br /> to create and choose among alternatives -the performance measures, criteria screens, <br /> models, expectations of outputs, and other decision-making tools we need. Once we are <br /> informed by the work above, we will use these tools to then create alternatives, and in <br /> turn characterize the likely performance of any given alternative. Following initial <br /> evaluations, further concept level physical designs maybe prepared, refined, and pushed <br /> forward toward more detailed applications of engineering and design tests. Watershed- <br /> based concepts will be formulated as alternatives as well (differing in scale, type and <br /> combination), in expectation of assembling an eventual framework of solutions/project <br /> ideas. In two years time, progress on this step of the planning process is expected to be <br /> significant, but is contingent upon findings and limitations from the earlier steps. <br /> 4. Alternative project plans (whether detailed plans for immediate implementation or <br /> concepts throughout the watershed) will be evaluated for effectiveness, efficiency, <br /> completeness and acceptability. The impacts (outputs, benefits, costs) of alternative plans <br /> will be evaluated using the system of accounts specified in Corps planning guidance. As <br /> with step #3, progress on this step in two years is highly contingent on other progress and <br /> findings. <br /> 5. Alternative plans will be compared. A cost effectiveness and incremental cost analysis, <br /> applied in combination with pertinent developed criteria (#2 above), will be conducted to <br /> prioritize and rank plan alternatives. Here too, in looking ahead two years, progress into <br /> this stage of planning is highly contingent on previous work progress. <br /> (The public involvement program will be used to obtain public input throughout the <br /> entire process described in steps 1-5 above.) <br /> 6. One or more plan alternatives will be selected for recommendation for implementation, <br /> and a justification for the plan selection will be prepared. For this study, this final <br /> selected "plan" will be multi-part: including all chosen projects, management solutions, <br /> watershed-based concepts for future implementations, or any other strategies - no matter <br /> how implementations maybe recommended to occur. As with steps 1-5 above, the <br /> public involvement process will be used to gain input throughout this plan selection- <br /> recommendation process. <br /> Finally, throughout our work we will systematically document our process, results and <br /> the study's findings, in preparation for eventually compiling the entire study findings into <br /> 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.