New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4232 Eugene Springfield Metro Waterways Study
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4232 Eugene Springfield Metro Waterways Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:57:41 PM
Creation date
6/23/2008 3:44:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004232
GL_Project_Number
945136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and its surrounding watershed (with an eye toward filling information gaps and <br /> ~r using existing sophisticated plans as a springboard for technical investigations and <br /> detailed plan alternatives). <br /> • Creating awatershed-scaled, detailed framework of on-ground project concepts <br /> and other types of solutions to identified problems - including a range of <br /> constructed, passive, and practice-oriented actions. <br /> • Preliminarily formulate site-specific on-ground projects/answers at the priority <br /> locations. <br /> • Coordinate with the basin-wide ESA consultation currently ongoing for the <br /> Corps' Willamette Valley Project, and the Corps' Willamette Floodplain GI study <br /> (which is just now also commencing near/within the metro area). <br /> • Examining the large number of institutional, jurisdiction, and partnership <br /> considerations at work here, and formulating an implementation framework which <br /> is responsive to those realities. <br /> • Conceive a logical implementation program for our answers -akin to a local <br /> government capital improvement program ("CIP") -for systematically <br /> implementing the projects and other solutions arising from the study. <br /> The watershed framework and specific project formulations feed off of each other. We <br /> will use the applied technical information, techniques, and methods developed in the <br /> "laboratory" provided by the priority/project areas to test and refine concepts and <br /> solutions within the framework. Conversely, understandings from the watershed <br /> dimension are critical to properly formulating solutions that actually address causal <br /> factors at any given waterway/locality. <br /> The eventual watershed framework product will be a strategic/action plan -comprised of <br /> specific tactical recommendations including identified projects, practice-based solutions <br /> (including protection), and institutional actions (including research, monitoring, <br /> evaluation, adaptive management and other implementing mechanisms). These will be <br /> laid out in a spatially and temporally, in a way that will poise the community to finish the <br /> detailed formulation and implementation of those recommended actions in an progressive <br /> manner - as resources and partnerships allow. <br /> Specific waterway projects -whenever they are fully developed -will be planned, <br /> engineered, and designed according to normal Corps procedures. The local communities <br /> of this area are familiar with these conventions. We cannot forecast at the study outset <br /> which and how many such projects would be developed. <br /> COORDINATION <br /> Study work will be conducted via extensive teamwork. There is going to be high levels <br /> of steering, coordination and participation from the three local sponsors -the cities of <br /> Eugene and Springfield, and Lane County; and additional significant cooperation and <br /> participation required of the four area watershed councils, the federal and state natural <br /> resource agencies, non-government organizations, and the public. Proper coordination <br /> among all these study participants is essential to maintain the project schedule, avoid <br /> <br /> ~w` duplication of efforts, detect problems in a timely manner, and to maintain agreement and <br /> 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.