New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4232 Eugene Springfield Metro Waterways Study
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4232 Eugene Springfield Metro Waterways Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 8:57:41 PM
Creation date
6/23/2008 3:44:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004232
GL_Project_Number
945136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Eugene-Springfield Metro Waterways Study March 2004 <br /> OVER VIEW <br /> The Project Management Plan (PMP) describes in detail the individual tasks and budget <br /> line items comprising this study, and readers are encouraged to reference those <br /> specifications. In the PMP, tasks are sorted into major functional groupings and described <br /> in accordance with the Corps' Civil Works Breakdown Structure (WBS). The grouping <br /> of tasks facilitates report/product preparation and compilation, and each grouping lays out <br /> the individual components of a necessary investigation: engineering, economics, <br /> environmental, plan formulation, etc. The descriptions address the reasons for tasks; the <br /> techniques, models, and procedures to be used; the organizational elements responsible <br /> for each task; and the expected cost of each task. Relationships and dependencies <br /> between tasks are addressed in these descriptions. <br /> The accompanying "workplan," as requested by the non-Federal sponsors, for the Federal <br /> fiscal years of 2004 and 2005, uses as its organizing principle the Corps' six-step <br /> planning process (also described in the PMP). <br /> 1) Identify potential waterway measures; <br /> 2) Build analytical decision-making tools (including criteria for projects); <br /> 3) Synthesize data and develop predictive models; <br /> 4) Execute activities to support identification and formulation of projects; <br /> 5) Integrate the study with other major water resource efforts; and <br /> 6) Establish an institutional and implementation framework. <br /> This process helped the study team assess which of the myriad WBS tasksr--over afour- <br /> or-more year course of study-would be primarily addressed at the onset of the <br /> feasibility phase. Logically, in the first two years we will expect to make greater <br /> headway on earlier components, in cases completing some foundational aspects of our <br /> work altogether. Perhaps we will touch later phases of this planning process, which <br /> ultimately ends with finished plans/designs and implementation (construction). <br /> This federal FY 04-05, we forecast to expend approximately $1.9 million of the estimated <br /> total of $3.4 million for the initial feasibility work. At this writing, the local sponsors <br /> have identified over $800,000 in funds and in-kind services for study's first two years, <br /> though this figure will increase substantively once some late survey/mapping and study <br /> co-management estimations are finalized. <br /> WORK OBJECTIVES <br /> The goal of the study is to identify and address problems related to widely varied water <br /> resource values across a complex set of urban watersheds. These issues including flood <br /> protection, floodplain management, habitat and species restoration and conservation, <br /> surface and ground water quality, recreation and open spaces, and stormwater <br /> management. Problems are widely documented due to sedimentation, destabilized <br /> tributary streams, changed hydrologic regimes and water fluctuations, and other impacts <br /> on the system caused by intense human activity in the metro area and elsewhere in the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.