Run Date: 09/03/2004 10:31:21 City of E ene <br /> 1 - <br /> Estimate D ibution <br /> Es~rimate: after bid opening <br /> Job - ONDS CONCRETE PATH & EARTHWORK <br /> Line No. Description Quantity Unit Unit Price Amount <br /> DELTA PONDS CONCRETE PATH 6c EARTHWORK <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $6,000.00 $6,000.00 <br /> 0020. CLEARING & GRUBBING 1.00 LUMPSUM $8,800.00 $8,800.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> 0040. EXCAVATION, UNCLASSIFIED 437.00 CUYD $26.00 $11,362.00 <br /> 0050. Compost Berm 500.00 LINFT $4.00 $2,000.00 <br /> 0060. Concrete 5 1/2~~ 2,100.00 SQFT $4.00 $8,400.00 <br /> 0070. Temrinate Tower Ground 1.00 LUMPSUM $1,250.00 $1,250.00 <br /> 0080. Reinstall Tower Ground 1.00 LUMPSUM $2,650.00 $2,650.00 <br /> 0090. Native Seed/Mulch 1.00 LUMPSUM $1,300.00 $1,300.00 <br /> Total General $43,762.00 <br /> Total DELTA PONDS CONCRETE PATH & EARTHWORK $43,762.00 <br /> DELTA PONDS CONCRETE PATH & EARTHWORK - Other / Direct <br /> General <br /> 0010. Contingency 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0020. SEED, NATIVE 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> 0030. Permits 1.00 LUMPSUM $500.00 $500.00 <br /> Total : General $7,500.00 <br /> Total : DELTA PONDS CONCRETE PATH & EARTHWORK - Other / Direct $7,500.00 <br /> <br /> DELTA PONDS CONCRETE PATH & EARTHWORK - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> Total General $10,000.00 <br /> Total DELTA PONDS CONCRETE PATH & EARTHWORK - Miscellaneous $10,000.00 <br /> <br /> Total after bid opening $61,262.00 <br /> <br />