Final Acceptance Public Works <br /> <br /> Completion of Warranty Period a"g'"°°''"9 <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 <br /> To: Wildish Construction Co. Date: October 12, 2005 <br /> PO Box 7428 <br /> Eugene OR 97401-0428 From: John Casto <br /> Project: Concrete Path and Earthwork at Delta Ponds <br /> Cpntract Number. 2005-16 Job Number. 4228 <br /> A warranty inspection has been made on this project in acoorcianoe with Section 00150 of the <br /> City Standarc Specifications and Standard Drawings. <br /> No defects were noted and/or were connected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRNATELY ENGINEERER PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> omspon ence ontractors Fina cceptance Comp ehon o Warranty oc <br /> ENO 1122 Contractor Flle Engineer Owner Surety PW Admin Revised 4/04 <br /> Finance/Accts Receivable for assessable protects or City Recorders Office for nonassessable projects <br /> <br />