/AX ~4 I btiC ~Jbb vi ~ i <br /> . Publlc Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eugene, Oregon 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 Fax <br /> ADDENDUM N0.1 <br /> i <br /> TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR ~ <br /> i <br /> CONCRETE PATH ~ EARTHWORK AT DELTA PONDS i <br /> I <br /> AUGUST 31, 2004 JOB #4228 QUOTE NUMBER 2T ' <br /> TO'ALL PLANHOLDERS: <br /> The following changes shall amend and supplement the project bidding documents only to the extent <br /> specifically shown and noted. All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items induded in this <br /> addendum and the total of these bid items then add in the appropriate place on the bid forth. <br /> CHANGES TO BID SCHEDULE: <br /> (DELETE) Original Bid Schedule dated 08/26/2004 <br /> ,;ADD) Revised Bid Schedule date 08/31/2004 <br /> CHANGES TO THE PLANS: <br /> SHEET 3 OF 13 <br /> (ADD) ADD TO NOTE: <br /> Dan Mooney can be reached at (541) 933-2471 or (541) 954-7042. <br /> If you have questions about this addendum or the project, please call Teri Higgins at (541) 682-8462. <br /> All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and <br /> submitting the signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum <br /> not eigned, will be considered informal. <br /> Mack Schoening, P.tY <br /> City Engineer <br /> Redeipt adknowledged and conditions agreed <br /> this 31 day of AUGUST , 2004. <br /> <br /> ,,Bidder. WILDISH C RUCTI N CO. <br /> By: <br /> Addendum <br /> RECEIVED TIME AUG. 31. 9:19AM PRINT TIME AUG. 31. 9:20AM <br /> <br />