New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4228 A-1 Quality Fence & Deck Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4228 A-1 Quality Fence & Deck Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:15:40 AM
Creation date
6/23/2008 2:48:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004228
GL_Project_Number
945322
Identification_Number
2006100324
COE_Contract_Number
2006-05317
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> Parks & Open Space Division <br /> City of Eugene <br /> 1820 Roosevelt Blvd. <br /> MEMORANDUM ~2~800n 97402 <br /> (541) 682-4882 FAX <br /> www.ci.eugene.or.us <br /> Date: February 16, 2005 <br /> To: Johnny Medlin, Parks and Open Space Division Manager <br /> <br /> ' From: Carolyn Weiss, Landscape Architect, Parks and Open Space Division <br /> Subject: Radio Tower Fencing at Delta Ponds (Personal Services Contract) <br /> Quotes for the construction of fencing at Delta Ponds were solicited and multiple proposals were <br /> received. The site is located off Good Pasture Island Road, south of Darlene Lane and adjacent to a <br /> newly constructed City parking lot. The site has a radio tower on it, and fencing is to protect both the <br /> radio tower infrastructure and park users. The City of Eugene is constructing the fence. around Churchill <br /> Media infrastructure as stipulated in a previous agreement. Churchill Media granted public easement to <br /> the City across their property with the understanding that the City would be responsible for constructing <br /> the fencing to protect the park users and the radio tower infrastructure. <br /> This work will be coordinated with the Chief Engineer for Churchill Media to ensure no loss of signal. <br /> The proposal submitted by A-1 Quality Fence and Deck Company is the lowest bid and will therefore <br /> receive the contract to construct the fencing. Specifications are as follows: <br /> • 80' of 12' tall flat top cedar fence and 1-3% 'gate around radio tower. Materials to be used are #1 <br /> 1x6x12 flat top cedar fence boards, cedar 2x4x8 rails (4 rails) per section. Treated 4x4x14 post. <br /> All post in cement. <br /> • 96' of 6' tall flat top cedar fence. Materials to be used are #1 1x6x6 flat cedar fence boards, cedar <br /> 2x4x8 rails (2 rails), treated 4x4x8 post. All post in cement <br /> • 150' of 3' high 3 rail cedar fence. Materials to be used are 6x6x6 cedar post, 4x4x8 rails, rails to <br /> be screwed into post as per drawing. All post in cement. <br /> Contractor intends to begin and complete work during the first two weeks of February, 2006. The <br /> contract total amount is $8,200. <br /> For more information, contact Carolyn Weiss, 682-4914. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.