New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4228 A-1 Quality Fence & Deck Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4228 A-1 Quality Fence & Deck Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:15:40 AM
Creation date
6/23/2008 2:48:00 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004228
GL_Project_Number
945322
Identification_Number
2006100324
COE_Contract_Number
2006-05317
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> Parks & Open Space Division <br /> City of Eugene <br /> 1820 Roosevelt Blvd. <br /> MEMORANDUM Eugene, Oregon 97402 <br /> (541)682-4800 <br /> (541) 682-4882 FAX <br /> vaww.ci.eugene.or.us <br /> Date: Apri15, 2006 <br /> To: Johnny Medlin, Parks and Open Space Division Manager <br /> From: Carolyn Weiss, Landscape Architect, Parks and Open Space Division <br /> Subject: Extension and Cost Amendment for Radio Tower Fencing at Delta Ponds <br /> An extension of the time for completion is requested by A-1 Quality Fence and Deck Company for the <br /> construction of fencing around radio tower infrastructure at Delta Ponds. To date, all the fence and gate <br /> posts have been set along the multi-use path, around the guy wire anchors, and around the main radio <br /> tower. Remaining tasks include installation of railing and gates, as well as the removal of the existing <br /> fence around the radio tower. <br /> Additionally, an amendment to the original estimate is required due to an additional charge of $1,080 to <br /> add extra footage (241f.) around radio tower. Original footage estimates vYere based on constructing the <br /> new fence in the same location as the existing fence; extra footage is needed in order for the new fence to <br /> be constructed around the existing fence prior to removal of the existing fence. <br /> The original contract amount was $8,200. Final contract total is $9,280. <br /> <br /> For more information, contact Carolyn Weiss, 682-4914. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.