Billable Project Costs As Of 09/3 0/2004 <br /> 10/18/2004 1:04:59 PM Page 3 of 102 <br /> <br /> Project Billed Asti- Total Amount Billed <br /> <br /> Billed ~ ~ TranDate Tranid Resource Employed uanti Amount O~erOvhd AdmOvhd Transaction Remark <br /> <br /> 0415 North Delta Ponds Path (4228) $52.74 $79.39 $132.13 <br /> 3636213 Materials Testine $52.74 $79.39 $132.13 <br /> 287C PCC gaality control (CE) $35.16 $52.93 888.09 <br /> 9/27/2004 061930023 Engineering Technician 2 2 L-H $35.16 $52.93 concrete testing <br /> 322-7 Concrete sample pickup $17.58 $26.46 $44.04 <br /> 9/28/2004 061930034 Engineering Technician 2 I L-H $17.58 $26.46 concrete sample pickup <br /> - <br /> <br />