<br /> 1 <br /> STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWER DRAWING <br /> EWEB MAP E-200-1 & E 200-3 <br /> DATE: August 25, 2006 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please provide power and connect 21-100 watt and 4-200 watt HPS street lights. Connect power at <br /> transformer 3211, and at secondary vault # 8749. <br /> These plans are outlined below and shown on the attached drawing: <br /> EWER CONSTRUCT N P S <br /> FEDERAL COURTHOUSE LIGHTING - Pro'e t 423 8 Ave.-Fer St. & Hw 99 <br /> Developer's Name: City of Eugene Eugene Water & Electric Board <br /> Telephone #:(541) 682-5228 Joe Ramirez <br /> COE Rep's Name: Randal Dale Prepared By: Kris Olson <br /> Telephone 682-4961 Telephone (541) 682-2657 <br /> PO Good Job # 4237 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> (21X$3.95 (100W) _ $82.95 and 4X$6.00 (200W) _ $24.00 Total <br /> $106.95) <br /> 1. Connect 21-100W & 4-200W high pressure sodium street lights as per attached drawing and bill <br /> $106.95/month as per EWER J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill The City of Eugene for the following work: <br /> Ditch: S <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: $ 144.00 <br /> (2X$47=$94.00 + $ 50 =$144.00) <br /> Totat: $ 144.00 <br /> Agency: L~ct~ c n Eugene Water & Electric Board <br /> Authorized by: By: <br /> pg-28-O b A05 ~ 3 "I I N <br /> 8-15-03 <br /> Q:\PROJECTS\PROJ-714237 courthouse transpo\Correspondence\EWEB\4237-20060824StreetLightConstNtc.doc <br /> <br />