_ <br /> EUGENE WATER & ELECTRIC BOARD <br /> ELECTRIC UNDERGROUND EXTENSION AGREEMENT \ <br /> J BAR 0 6 2007 <br /> Date of Application: February 2, 3007 <br /> CITY OF EUGENE, hereinafter called the customer, requests the Eugene Water 8 Electric Board, hereinafter called EWER, to extend Its electric system to <br /> serve: <br /> Project Name & Location: HILYARO & Br" STREET CONFLICTS <br /> E. 8T" AVE FROM FERRY STREET TO HiLYARD STREET <br /> Customer agrees the electric distribution extension will be provided in accordance with the requirements and obligations of this Agreement and <br /> the attached Exhibits. Utility service is also subject to EWEB's applicable polities, regulations and rates now in existence or hereafter adopted, and the <br /> attached drawing #D•24340-E. Customer has received and read copies of EWEB's existing written polities and standards. <br /> Customer will execute all easements required by EW EB at no cost to EWER. When practical, the customer will Include such easements in the <br /> recorded plat of the above-mentioned development. Customer will further record deed restrictions requiring underground service to all properties to be <br /> served by the underground distribution system being installed. Customer agrees that all e i provide that no buildings or structures maybe <br /> constructed on such easements. ' <br /> Customer 1s aware of the right, as provided in ORS 92.09 I e to design or supervise the installation of the <br /> improvements provided for in this Agreement, but detiines to do so. <br /> Unless otherwise spedfied in this Agreement, the customer ag top ~ fo0 oyoi~eMension charges prior to EW EB's commencement of <br /> work: " 7 . <br /> Contribution in aid of construction = $ 48,178 <br /> Other =STREET LIGHT & TRAFFIC SIGNAL CONNECTIONS TO BE BILLED AT A LATER DATE <br /> All charges above are subject to change if this Agreement is not signed and returned within thirty (30) days of the application date above and if <br /> the extension facilities are not installed with permanent service connections within six (ti) months of the date of application. <br /> This Agreement authorizes EWEB to proceed with the necessary steps to provide electrical underground services as shown on the attached <br /> drawing; however, it is understood that until the conditions of this Agreement are complied with, EWEB will not install the extension fatalities. <br /> Customer agrees to inform all subsequent owners of the requirements and obligations of underground service in accordance with the Board's _ <br /> policies and procedures. This Agreement shall bind and benefit the heirs, personal representatives, successors or assigns of the respective parties. <br /> ® EWEB-CONSTRUCTED SUBSTRUCTURES: <br /> Customer will be responsible for providing, within six inches (6") of final grade, compacted level ground of adequate width for <br /> EWEB to install the utility systems. Customer will provide flnist?ed grade stakes and property corners so EWEB can ir?stall the utility <br /> system at proper depth and location. Customer will monitor EWEB's installation to assure the installation is according to stakes that <br /> have been provided. <br /> ? CUSTOMER-INSTALLED SUBSTRUCTURES: <br /> Customer will own and maintain ail customer•installed ducts and vaults, including service ducts in accordance with EWEB's <br /> service policies. EWEB will own and maintain all other underground system facilities. It is understood that the customer will <br /> construct and furnish service lateral, including duct, trench and backflll in accordance with EWER policy. <br /> Customer assumes all liability and agrees to indemnify EWEB for all damages to EWEB facilities caused by the customer or <br /> customer's agents. <br /> After one year, EWEB shall assume ownership and responsibility for maintenance and repair of the service lateral conductors <br /> only. (See Board Policy, Electric Service Section IID(5).) <br /> ? DEVELOPER-INSTALLED SUBSTRUCTURES: <br /> EWEB shall allow Developer to construct substructure facilities required to serve a development. <br /> Electric substructure installed in accord with Construction ey Developer (CBD) policy must comptywith the CBD Handbook, <br /> approved drawings, standards and material specifications. All work will be inspected, and installations that do not comply will not be <br /> energised. Once accepted, electric substructure installed by the CBD policy becomes the property of EWEB. Developers are <br /> required to provide payment and performance bonds, and to warrant the work for one year after acceptance. <br /> All service conduit will be installed, owned and maintained by customer. <br /> Date Customer Signed: y'phr„ar„X . 2007 (541) 682-5228 <br /> 1 <br /> CITY OF EUGENE HomelBusiness Phone <br /> <br /> ~l?t.-, ~1 rk_ S~i;~ening. P.E. <br /> ~J/ Business name or ustomer erne Printed) <br /> f ) <br /> Cellular Phone <br /> Au ~ rize ignature <br /> 244 E. BROADWA Company TIN# <br /> EUGENE OREGON 97401 <br /> Mailing Address Customer Social Security Number (options!) <br /> EUGENE~W-ASTER 8 ELECTRIC BOARD Job 28935 Job Chief: STEVE BUZALSKY <br /> By: r' ~ <br /> Electric Distr Uon upervisor <br /> Date: _ ~=.5^C~ u7 <br /> Date Connected <br /> Revised: 11123!04 <br /> <br />