' y EUGENE WATER & ELECTRIC BOARD <br /> ELECTRIC UNDERGROUND EXTENSION AGREEMENT <br /> Date of Application: February 2, 3007 <br /> CITY OF EUGENE, hereinafter called the customer, requests the Eugene W ater & Electric Board, hereinafter called EW EB, to extend its electric system >p <br /> sgrve: <br /> Project Name 8 Location: HILYARD 8 8T" STREET CONFLICTS <br /> E. 8T" AVE FROM FERRY STREET TO HILYARD STREET <br /> Customer agrees the electric distribution extension will be provided in accordance with the requirements and obligations of this Agreement and <br /> the attached Exhibits. Utility service is also subject to EWEB's applicable polides, regulations and rates now in existence or hereafter adopted, and the <br /> attached drawing #D-24340-E. Customer has received and read copies of EWEB's existing written polides and standards. <br /> Customer will execute alt easements required by EWEB at no cost to EWEB. When practical, the customerwill indude such easements in the <br /> recorded plat of the above-mentioned development. Customer will further record deed restrictions requiring underground service to all properties to be <br /> s®rved by the underground distribution system being installed. Customer agrees that all easements shall provide that no buildings or structures maybe <br /> constructed on such easements. <br /> Customer is aware of the right, as provided in ORS 92.097, to employ a licensed engineer to design or supervise thQ installation of the <br /> improvements provided for in this Agreement, but dedines to do so. <br /> Unless otherwise spedfied in this Agreement, the customer agrees to pay for the following extension d~arges prior to EWEB's commencement of <br /> work: <br /> ConMbution in aid of construction = S 48,178 <br /> Other =STREET LIGHT b TRAFFIC SIGNAL CONNECTIONS TO BE BILLED AT A LATER DATE <br /> NI charges above are subject to change if this Agreement is not signed and returned within thirty (30) days of the application date above and if <br /> the extension fadlities are not installed with permanent service connections within six (ti) months of the date of application. <br /> This Agreement authorizes EWEB to proceed with the necessary steps to provide electrical underground services as shown on the attached <br /> drawing; however, it is understood that until the conditions of this Agreement are complied with, EWEB will not install the extension fadlities. <br /> Customer agrees to inform all subsequent owners of the requirements and obligations of underground service in accordance witfi the Board's <br /> pplides and procedures. This Agreement shall bind and benefit the heirs, personal representatives, successors or assigns of the respective parties. <br /> ® EWEB-CONSTRUCTED SUBSTRUCTURES: <br /> Customer will be responsible for providing, within six inches (6") of final grade, compacted level ground of adequate width for <br /> EWEB to install the utility systems. Customer will provide finished grade stakes and property corners so EWEB can install the utility <br /> system at proper depth and location. Customer will monitor EWEB's installation to assure the installation is according to stakes that <br /> have been provided. <br /> ? CUSTOMERdNSTALLED SUBSTRUCTURES: <br /> Customer will own and maintain all customer-installed ducts and vauks, including service ducts in accordance with EWEB's <br /> service policies. EWEB will own and maintain all other underground system facilities. It is understood that the customer will <br /> construct and furnish service lateral, including duct, trench and backfill in accordance with EWEB policy. <br /> Customer assumes all liability and agrees to Indemnify EWEB for all damages to EWEB facilities caused by the customer or <br /> customers agents. <br /> After one year, EWEB shall assume ownership and responsibilityfor maintenance and repair of the service lateral conductors <br /> only. (See Board Policy, Electric Service Section IID(5).) <br /> ? DEVELOPER-INSTALLED SUBSTRUCTURES: <br /> EWEB shall allow Developer to construct substructure facilities required to serve a development. <br /> Electric substructure installed in accord with Construction By Developer (CBD) policy must compiywkh the CBD Handbook, <br /> approved drawings, standards and material specifications. All work will be inspected, and installations that do not complywill not be <br /> energized. Once accepted, electric substructure installed by the CBD policy becomes the property of EWEB. Developers are <br /> required to provide payment and performance bonds, and to warrant the work for one year after acceptance. <br /> All service conduit will be installed, owned and maintained bycustomer. <br /> Date Customer Signed: Rehruary 15. 2007 (541) 682-5228 <br /> CITY OF EUGENE P ~ E . Home/Business Phone <br /> <br /> y~c., Mark Schoening, <br /> ~P'~'r/ usiness name or Customer Name (Printed) <br /> ( ~ <br /> Cellular Phone <br /> Au riz ignature <br /> 244 E. BROADWA CompanyTlN# <br /> EUGENE OREGON 97401 <br /> ,ailing Address Customer Sodal Security Number (optional) <br /> EUGENE WATER & ELECTRIC BOARD Job 28935 Job Chief: STEVE BUZALSKY <br /> Electrc Distribution Supervisor <br /> ~ <br /> Date Connected <br /> Revised: 11/23/04 <br /> <br />