New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4237 EWEB Pmt 02.28.07
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4237 EWEB Pmt 02.28.07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:19:01 AM
Creation date
6/23/2008 2:16:41 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004237
GL_Project_Number
955014
Identification_Number
2007013331
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> - ~ - FEB 0 8 2007 <br /> February 2, 2007 <br /> _ «r ~ E. 8th Ave Btwn High & Halyard <br /> E W E B Estimated Construction liegM Date= 2/15!07 <br /> Summary of costs for installation of substructure of Water, Electric, Cable and Phone facilities. This work <br /> includes the substructure installation of pipe, conduit, and vaults. It does NOT include the Installation of <br /> Wire dr Trensfotmers, whk:h will be invoiced separatey. <br /> Job Number: 25075 <br /> Electrical Distribution Designs: Steve Buzalsky 341-8523 <br /> TIII3 ESTII~fATE ASSiJIt~S THE FOLLOWING: <br /> Construction is performed as a CABLE REPLACEMENT. <br /> Weather conditions do not affect labor costs for Cable Repl. <br /> The project elevation is BELOW 500. feet. <br /> The job site is 0.5 miles from EWEB Headquarters. <br /> The job site is 3.5 miles from Fill Disposal Site. <br /> Facilities will be installed under asphalt or concrete with 57 INCHES OF COVER <br /> 0 short water services and O long water services will be installed. <br /> 0 joint service crossing(s),0 water only service crossing(s), and 3 electric only crossing(s) will be installed. <br /> EWER Contributlon ~ <br /> If you approve of the enclosed documents and would like EWEB to proceed with construction, please sign and return ¢~t , <br /> agreements, along with your payment, in the enclosed envelope. If you are a corporation, the president should sign the agreements. <br /> A fully executed agreement wilt be returned to you. At that time, I will be coordinating the construction of your project. Please <br /> contact me at 341-1832, or ce11228-0552, for schedule information or to answer any questions you may have. <br /> Sincerely, n <br /> vl(- i~~ <br /> Rick Sitowski <br /> Construction Management Technician <br /> Enclosures: 2- Substructure Installation Contracts <br /> 2- Drawings each # D-24340-E <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.