<br /> . ti 00940 930 Type "W2" Signs In Place Sq. Ft. Sq. Ft. 16.00 $ 15.50 $ 248.00 <br /> 00940 940 Type "W4" Signs In Place Sq. Ft. Sq. Ft. 25.50 $ 17.00 $ 433.50 <br /> 00940 950 Type "Y1"Signs In Place Sq. Ft. Sq. Ft. 183.00 $ 16.50 $ 3,019.50 <br /> 00940 960 Type "Y2" Signs In Place Sq. Ft. Sq. Ft. 9.00 $ 16.00 $ 144.00 <br /> 00940 970 Type "Y5" Signs In Place Sq. Ft. Sq. Ft. 41.00 $ 15.00 $ 615.00 <br /> 00950 980 Removal of Existing Illumination Lump Sum Lump Sum All Lump Sum $ 11,500.00 <br /> 00950 990 Reinstallation of Existing Illumination Lump Sum Lump Sum All Lump Sun1 $ 26,000.00 <br /> 00970 1000 Street Lights, Complete Lump Sum Lump Sum All Lump Sum $ 250,000.00 <br /> 00990 1010 Traffic Signal Installation, 8th Ave. and Mill St. Lump Sum Lump Sum Alf Lump Sum $ 190,000.00 <br /> 00990 1020 Traffic Signal Installation, Hilyard St. and 8th <br /> Ave. Lump Sum Lump Sum All Lump Sum $ 120,000.00 <br /> 00990 1030 Traffic Signal Modification, E. Broadway St. and <br /> Mill St. Lump Sum Lump Sum All Lump Sum $ 60,000.00 <br /> 00990 1040 Traffic Signal Modification, E. Broadway St. and <br /> Hilyard St. Lump Sum Lump Sum All Lump Sum $ 195,000.00 <br /> 00990 1050 Interconnect System Lump Sum Lump Sum All Lump Sum $ 10,000.00 <br /> 00990 1060 Loop Detector Installation, 6th St. and High St. <br /> Lump Sum Lump Sum All Lump Sum $ 3,000.00 <br /> 00990 1070 Loop Detector Installation, 11th St. and Franklin <br /> St. Lump Sum Lump Sum All Lump Sum $ 3,000.00 <br /> 00990 1080 Loop Detector Installation, Franklin St. Lump Sum Lump Sum All Lump Sum $ 3,000.00 <br /> RIGHT-OF-WAY DEVELOPMENT AND CONTROL <br /> 01020 1090 Tree Preservation Lump Sum Lump Sum All Lump Sum $ 5,000.00 <br /> 01030 1100 Permanant Seeding Lump Sum Acre 0.134 $ 15,242.00 $ 2,042.43 <br /> 01030 1110 Bio-swale Seed Mix Lump Sum Acre 0.204 $ 15,242.00 $ 3,109.37 <br /> 01040 1120 Topsoil Cu. Yd. Cu. Yd. 1,230.0 $ 30.00 $ 36,900.00 <br /> 01040 1130 Deciduous Trees, 2 Inch Caliper Each Each 77 $ 250.00 $ 19,250.00 <br /> 01040 1140 Shrubs, No. 1 Container Each Each 5,540 $ 9.00 $ 49,860.00 <br /> 01040 1150 Shrubs, No. 2 Container Each Each 256 $ 14.00 $ 3,584.00 <br /> 01040 1160 Bulbs Each Each 2,500 $ 3.00 $ 7,500.00 <br /> 01040 1170 Type A Mulch Cu. Yd. Cu. Yd. 95.0 $ 35.00 $ 3,325.00 <br /> 01040 1180 Type C Mulch Cu. Yd. Cu. Yd. 170.0 $ 35.00 $ 5,950.00 <br /> 01040 1190 Tree Grates Each Each 9 $ 1,500.00 $ 13,500.00 <br /> 01050 1200 Wrought Iron Fence, 3 Rail Ft. Ft. 806.0 $ 72.00 $ •58,032.00 <br /> WATER SUPPLY SYSTEMS <br /> 01120 1210 Irrigation System Lump Sum Lump Sum All Lump Sum $ 30,000.00 <br /> 01120 1220 Irrigation System Remodel Lump Sum Lump Sum All Lump Sum $ 18,000.00 <br /> Subtotal, Biddable Items $ 3,911,140.70 <br /> Construction Engineering $ 385,632.00 <br /> Anticipated Items RR Flagging $ 7,500.00 <br /> RR Construction $ 96,000.00 <br /> Subtotal, Biddable Items, Anticipated Items and CE $ 4,400,272.70 <br /> Contingencies @ 3.5% $ 154,009.54 <br /> TOTAL CONSTRUCTION COST (PHASE 2) $ 4,554,282.25 <br /> TOTAL PROJECT COST (PHASE 2) a 4,554,282.25 <br /> <br />