4 <br /> Page 3 <br /> <br /> Run Date: 09/01/2006 16:56:40 City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: WILDISH CONSTRUCTION Original Contract: $1,905,176.50 <br /> ,lob q: 93-004240 Current Amount: $1,905,176.50 <br /> Contract No: 2006-00021 Contract Award Date: 05/24/2006 <br /> pp q: 2006100434 Completion Date: 10/20/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals B Complete <br /> Last Cling Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> Line Description <br /> 0180 9' CHAIN-LINK FENCE $13.00 LINFT 275.000 $3,575.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 8' CHAIN-LINK FENCE $18.00 LINFT 995.000 $17,910.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0200 8'x8' FT SINGLE CHAIN LINK GAT $250.00 EACH 4.000 $1,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0210 TYPE 2 FIELD FENCE $3.50 LINFT 8,000.000 $28,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0220 14' FT STOCKYARD GATE ~ $200.00 EACH 8.000 $1,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0230 MDLTIPLE MAILBOX SUPPORTS $350.00 EACH 3.000 $1,050.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0240 GENERAL EXCAVATION $7.00 CUYD 20,238.000 $141,666.00 0.000 $0.00 20,784.000 $145,488.00 103.00 <br /> 0250 SUBGRADS GEOTEXTILH $0.75 SQYD 11,000.000 $8,250.00 208.330 $156.25 8,520.330 $6,390.25 77.00 <br /> 0260 8 INCH STORM DRAIN PIPE $92.00 LINFT 28.000 $2,576.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0270 12 INCH CONCRETE PIPS $35.50 LINFT 303.000 $10,756.50 0.000 $0.00 188.000 $6,674.00 62.00 <br /> 0280 24 INCH REINFORCED CONCRETE PI $60.00 LINPP 765.000 $45,900.00 0.000 $0.00 730.000 $43,800.00 95.00 <br /> 0290 SLOPE END SECTIONS, WITH RIP R $700.00 EACH 10.000 $7,000.00 8.000 $5,600.00 10.000 $7,000.00 100.00 <br /> 0300 12 INCH CCP AREA DRAIN $850.00 EACH 3.000 $2,550.00 2.000 $1,700.00 2.000 $1,700.00 67.00 <br /> 0310 10 INCH PVC WW PIPE $150.00 LINFT 165.000 $24,750.00 165.000 $24,750.00 165.000 $24,750.00 100.00 <br /> 0320 TV PIPE INSPECTION $1.00 FOOT 165.000 $165.00 165.000 $165.00 165.000 $165.00 100.00 <br /> 0330 CONCRETE SANITARY WASTEWATER M $2,400.00 EACH 1.000 $2,400.00 0.600 $1,920.00 0.800 $1,920.00 80.00 <br /> 0340 MINOR ADJUSTMENT OF MANHOLES $600.00 EACH 2.000 $1,200.00 2.000 $1,200.00 2.000 $1,200.00 100.00 <br /> 0350 COLD PLANE PVMT REMOVAL, VARIO $0.50 SQFT 25,756.000 $12,879.00 9,000.000 $4,500.00 9,000.000 $4,500.00 35.00 <br /> 0360 AGGREGATE BASE $19.00 CUYD 18,887.000 $358,853.00 2,887.000 $54,853.00 18,887.000 $358,853.00 M 100.00 <br /> 0370 STONE EMBANKMENT (IMPORTED) $16.00 CUYD 8,893.000 $142,288.00 0.000 $0.00 9,214.000 $147,424.00 104.00 <br /> <br />