<br /> Run Date: 10/05/2006 15:05:14 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: WILDZSH CONSTRUCTION Original Contract: $1,905,176.50 <br /> Job 93-004240 Current Amount: $1,905,176.50 <br /> Contract N0: 2006-00021 Contract Award Date: 05/24/2006 <br /> PO 2006100434 Completion Date: 10/20/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals t Complete <br /> :ine Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> )180 9' CHAIN-LINK FENCE $13.00 LINFT 275.000 $3,575.00 176.000 $2,288.00 176.000 $2,288.00 64.00 <br /> )190 8' CHAIN-LINK FENCE $18.00 LINFT 995.000 $17,910.00 715.000 $12,870.00 715.000 $12,670.00 72.00 <br /> )200 8'x8' FT SINGLE CHAIN LINK GAT $250.00 EACH 4.000 $1,000.00 3.500 $875.00 3.500 $875.00 88.00 <br /> )210 TYPE 2 FIELD FENCE $3.50 LINFT 8,000.000 $28,000.00 0.000 $0.00 0.000 $0.00 0.00 <br /> )220 14' FT STOCKYARD GATE $200.00 EACH 8.000 $1,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> )230 MULTIPLE MAZ LBOX SUPPORTS $350.00 EACH 3.000 $1,050.00 0.000 $0.00 0.000 $0.00 0.00 <br /> )240 GENERAL EXCAVATION $7.00 CUYD 20,238.000 $141,666.00 9.000 $63.00 20,793.000 $145,551.00 103.00 <br /> )250 SUBGRADE GEOTEXTILE $0.75 SQYD 11,000.000 $8,250.00 69.670 $52.25 8,590.000 $6,442.50 78.00 <br /> )260 8 INCH STORM DRAIN PIPS $92.00 LINFT 28.000 $2,576.00 31.000 $2,852.00 31.000 $2,852.00 111.00 <br /> )270 12 INCH CONCRETE PIPE $35.50 LINFT 303.000 $10,756.50 42.000 $1,991.00 230.000 $8,165.00 76.00 <br /> )280 24 ZNCH REINFORCED CONCRETE PI $60.00 LINFT 765.000 $45,900.00 142.000 $8,520.00 872.000 $52,320.00 114.00 <br /> )290 SLOPE END SECTIONS, WITH RIP R $700.00 EACH 10.000 $7,000.00 0.000 $0.00 10.000 $7,000.00 100.00 <br /> 1300 12 INCH CCP AREA DRAIN $850.00 EACH 3.000 $2,550.00 1.000 $850.00 3.000 $2,550.00 100.00 <br /> X310 10 INCH PVC WW PIPE $150.00 LINFT 165.000 $24,750.00 0.000 $0.00 165.000 $24,750.00 100.00 <br /> X320 TV PIPE INSPECTION $1.00 FOOT 165.000 $165.00 0.000 $0.00 165.000 $165.00 100.00 <br /> X330 CONCRETE SANITARY WASTEWATER M $2,400.00 EACH 1.000 $2,400.00 0.000 $0.00 0.800 $1,920.00 80.00 <br /> X390 MINOR ADJUSTMENT OF MANHOLES $600.00 fiACN 2.000 $1,200.00 0.000 $0.00 2.000 $1,200.00 100.00 <br /> X350 COLD PLANE PVMT REMOVAL, VARIO $0.50 SQFT 25,758.000 $12,879.00 16,758.000 $8,379.00 25,758.000 $12,879.00 100.00 <br /> X360 AGGREGATE SASE $19.00 CUYD 18,887.000 $358,853.00 0.000 $0.00 18,887.000 $358,853.00 M 100.00 <br /> X370 STONE EMBANKMENT (IMPORTED) $16.00 CUYD 8,893.000 $142,288.00 9.000 $144.00 9,223.000 $147,568.00 104.00 <br /> <br />