Run Date :•12/07/2006 10:13:22 <br /> Page a <br /> City of Eugene <br /> Contract preliminary Pzogrees Payment <br /> Payment No : 006 <br /> Contractor: WILDISH CONSTRUCTION Original Contract: $1,905,176.50 <br /> Job N: 93-004240 Current Amount: $1,931,165.04 <br /> Contract No: 2006-00021 Contract Avazd Date: 05/24/2006 <br /> PO N: 2006100434 Completion Date: 10/20/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 4 Complete <br /> Line Description Last Chag Ord Unit Price Unit Meaaure Quantity Amount tiC Amount antit Amount ' <br /> 0380 LEVEL 3, 3/4• DENSE, HMAC $36 00 TON 13 000 000 $468 000 00 0 000 $0 00 12 70B 710 $457 513 56 M 9B 00 <br /> 0390 CONCRETE DRAINAGE CURBS $6.00 LINPT 150.000 $900.00 0.000 $0.00 70.000 5420.00 47.00 <br /> 0400 REMOVE EXISTING SIGNS $600.00 LVMPSUM 1.000 $600.00 0.000 $0.00 1.000 $600.00 100.00 <br /> 0410 REMOVE AND REINSTALL EXISTING $7 600.00 LDNPSUM 1 000 $7 600 00 0 000 $0 00 0 900 $6 840 00 90 00 <br /> 0420 STREET LIGHTS, COMPLETE $228,000.00 LUMPSUN 1.000 $128,000.00 0.000 $0.00 0.750 $96,000.00 75.00 <br /> 0430 NEW PERMANENT TRAFFIC SIGNS, C $44,000.00 LUMPSUM 1.000 $44,000.00 0.000 $0.00 0.500 $22,000.00 50.00 <br /> 0440 Type A-2 Pavement Legends, Com <br /> $1 700 00 LUMPSUN 1 000 $1 700 00 0 000 $0 00 1 000 <br /> $1 700 00 loo ao <br /> <br /> 0450 Type I Raised Pavement Markers <br /> $1,600.00 LUMPSUM 1.000 $1,600.00 0.000 $0.00 1.000 $1,600.00 100.00 <br /> 0460 Method B (g) Durable Pvmt Stri $19,000.00 LUMPSUM 1.000 $19,000.00 0.000 $0.00 1.000 $19,000.00 100.00 <br /> <br /> 0970 REMOVE CONCRETE LOCALI2ER PAD $4,000.00 LUMPSUN 1.000 $4,000.00 0.000 0.00 1.000 4 000.00 100.00 <br /> <br /> 0480 SBPTIC TANK DSCOlMISION 001 $835.00 LUMPBUM 1.000 $835.00 1.000 $835.00 1.000 $835.00 100.00 <br /> <br /> 0490 STAKE BR0SI0N MATTING 001 $1,251.00 LVMPSUM 1.000 $1,251.00 1.000 $1,251.00 1.000 51,251.00 100.00 <br /> <br /> 0500 CEDAR TREES, 1-1/2• CALIPER 001 $298 00 EACH 10 000 52 980 00 10 000 $2 980 00 10 000 $2 980 00 100 00 <br /> <br /> 0510 REPLACE RSPLBCTIVB MARRER8 001 $7.00 BACH 5;.000 $;71.00 53.000 $371.00 53.000 $371.00 100.00 <br /> <br /> 0520 RESTRIPS PARKER DR/DOUGLA8 001 $1.95 LINFT 240.000 $708.00 240.000 $708.00 240.000 $708.00 100.00 <br /> <br /> 0530 INSTALL ADDITIONAL MUTCD SIGNS 001 $85.00 SQPT 96 000 $8 160 00 96 000 $8 160 00 96 000 $8 160 00 100 00 <br /> <br /> 0540 UPGRADE LIGHTS TO BREAKAWAY 001 $10,783.54 LUMPSUM 1.000 $10,783.51 0.000 $0.00 0.000 $0.00 0.00 <br /> 0550 REMOVE STRIPES ON DRAKE DR. 001 $1.50 LINFT 600.000 $900.00 600.000 $900.00 600.000 $900.00 100.00 <br /> $1,931,165.04 $18,658.00 $1,847,548.56 <br /> <br />