New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4254 Change Order (1)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4254 Change Order (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:18:36 AM
Creation date
6/23/2008 10:09:48 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004254
GL_Project_Number
955085
Identification_Number
2005100447
COE_Contract_Number
2005-00024
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # x254 <br /> Contrail # 2005-24 <br /> CONTRACTOR: Planned & Engineered Construction Inc. Change Order # 1 <br /> (ADDRESS) 3400 Centennial Drive Date: <br /> Helena, MT. 59601 CAMS Date: <br /> Reviewed by: Date: fJ~z$lDs <br /> PROJECT: 2005 Wastewater Rehabilitation Project Basins DF-13,14,15 & 16 Inspector: M. Wilson <br /> Located Primarily in fhe S.E. Portion of Eugene <br /> Prot. Mgr. R. Heil <br /> Principal Eng. M. Cahill <br /> <br /> You are directed to make the following changes in this contract <br /> Contract <br /> Item <br /> No. <br /> 530 ck Excavation <br /> 540 Sli Linin 12" PVC <br /> 550 Extra Line Cleanin Elk Avenue <br /> 560 Misc. Extra Work <br /> Sri final Com lotion date was Se tember 15 2005 revised com lotion date is October 28 2005. <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a Units Cost Amount Chan a Chan e <br /> 530 Rock Excavation Ori final 0.00 0.00 0.00 X0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 1.00 L5 7 339.51 7 339.51 7 339.51 <br /> 540 Slip Linning 12" PVC Ori final 0.00 0.00 .00 #0•~ <br /> Revised 0.00 .00 0.00 <br /> Amended 1.00 LS 2065.86 065.86 2065.86 <br /> 550 Extra Cleaning Elk Ave. Ori final 0.00 0.00 0.00 Sa•~ <br /> Revised 0.00 .00 .00 <br /> Amended 1.00 LS 413.44 413.44 413.44 <br /> 560 Misc. Extra Work Ori final 0.00 0.00 .00 30•~ <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 741.52 741.52 ;3 741.52 <br /> Ori final 0.00 0.00 0.00 So•~ <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 0.00 .00 0.00 <br /> Orl Inal 0.00 .00 0.00 So•~ <br /> Revised 0.00 0.00 .00 <br /> Amended 0.00 0.00 0.00 ;0.00 <br /> The original contract work days are o.o da <br /> The contract time change this C.O o.o ds <br /> The contract time change by previous C.O.'s o.o da s <br /> The new contract work da are o.o da s <br /> The original contract stun was 11.155.570.35 <br /> Net change by previous change order 30.00 <br /> Net change due to amendment by previous change order So.Oo <br /> The contract sum prior to this change order was 11,155.570.35 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.