1 <br /> Run Date: 10/04/2005 09:56:33 <br /> City of Eugene Page 4 <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: PEC, INC. <br /> Job 93-004259 Original Contract: $1,155,570.35 <br /> Contract No: 2005-00024 Current Amount: $1,155,570.35 <br /> PO 2005050465 Contract Award Date: 05/16/2005 <br /> Assessable: No Completion Date: 09/15/2005 <br /> Line Description Current Contract Estimated Payment Cumulative Totals <br /> Last Chng Ord Unit Price Unit Measure Quantity Amount ~ Complete <br /> Quantity Amount Quantity <br /> Amount <br /> 0380 MH RHMOVH - SAN $750.00 BACE <br /> 1.000 $750.00 0.000 $0.00 2.000 <br /> 0390 MH 24" RISER - SAN $1,500.00 200.00 <br /> $1,600.00 EACH 1.000 $1,600.00 0.000 $0.00 0.000 <br /> 0400 RECONSTR. EXT DROP $0.00 0.00 <br /> $1,600.00 EACH 1.000 <br /> 0410 MH CUT-IN - SAN $1,600.00 0.000 $0.00 1.000 $1,600.00 <br /> 100.00 <br /> Ssso.oo EACx l.ooo Ssso.oo o.ooo So.oo o.ooo <br /> 0420 RELEVEL MH SASE $0.00 0.00 <br /> $275.00 EACH 1.000 $275.00 0.000 $0.00 0.000 <br /> 0430 ABANDON EXIST. PIPE IN PLACE $0.00 0.00 <br /> $2.20 LINPT 2,398.000 $5,275.60 731.000 $1,608.20 837.000 <br /> 0440 PLUG INVACTIVE SVC. $1,841.40 35.00 <br /> $500.00 EACH 2.000 $1,000.00 0.000 <br /> $0.00 1.000 $500.00 50.00 <br /> 0450 PLUG PIPE ENDS $110.00 EACH <br /> 19.000 $2,090.00 2.000 $220.00 17.000 <br /> 0460 CLHANOUT W/CIC 6• - 3AN $1,870.00 89.00 <br /> $330.00 EACH 3.000 $990.00 0.000 $0.00 7.000 <br /> 0470 CLEANOUT W/CIC 8" - SAN $2,310. UO 233.00 <br /> $360.00 EACH 1.000 $360.00 0.000 <br /> $0.00 1.000 $360.00 100.00 <br /> 0480 CURB & GUTTER, REM/REPL $44.00 LINFT <br /> 0490 POTHOLE 240.000 $10,560.00 132.500 $5,830.00 182.500 $8,030.00 <br /> $500.00 EACH 5.000 76.00 <br /> S2,soo.oo o.ooo $o.o0 4.000 $2,000.00 <br /> 0500 DYE TEST AND CONN. VERIFICATIO 80.00 <br /> $105.00 EACH 223.000 $23,415.00 0.000 $0.00 227.000 <br /> 0510 MAJOR VERIFICATION $23,835.00 102.00 <br /> $zso.oo EACH lo.ooo S2,soo.oo o.ooo $o.o0 2.000 <br /> <br /> 0520 TV IN3P&CT4 LOCATE EbTG. SVC. $500.00 20.00 <br /> $250.00 EACH 15.000 $3,750.00 0.000 $0.00 30.000 <br /> $7,soo.oo 200.00 <br /> $1,155,570.35 $70,541.48 <br /> $1,086,209.86 <br /> <br />