<br /> ,r <br /> Run Date: 12/07/2005 16:93 :OB <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payalapt No i 006 <br /> Contractor: PEC, INC. <br /> .lob N: 93-004254 Original Contract: $1,155,570.39 <br /> Contract No: 2005-00024 Cuzrent Amount: $1,171,130.68 <br /> PO p: 2005050465 Contract Avard Date: 05/16/2005 <br /> Assessable: No Completion Date: 09/19/2009 <br /> Line Description Last CAng Ord Current Cop[ract Bat imated Payment <br /> Unit Price Unit Measure ant ity Cumulative Tot ale t Complete <br /> 7005 NABTHNATRR Amount aptit Amoupt anti[ Amount <br /> RRNABILITATI0N DP BA82N8 <br /> Oanwral <br /> 0000 Liquidated Damages <br /> ($500.00) DAY 0.000 $0.00 0.000 <br /> 0010 MOBILIZATION $0.00 0.000 $0.00 0.00 <br /> $22,500.00 LUMPSUM 1.000 522,500.00 0.000 <br /> 0020 TEMP PROTHCTN DIRSCTN $0.00 1.000 $22,500.00 100.00 <br /> 27,500.00 LUMPSUM 1.000 $27 500.00 0.000 <br /> 0030 HROSION CONTROL 50.00 1.000 27 500.00 100.00 <br /> $2,200.00 LVMPSUM 1.000 $2,200.00 0.000 <br /> 0040 LANDSCAPE $0.00 1.000 $2,200.00 100.00 <br /> $24,300.00 LUMPSVM 1.000 $24,200.00 0.000 <br /> 0050 TV INSPECTION CLEANING PRE fi $0.00 1.000 $24,200.00 100.00 <br /> 25 000.00 LUMPSUM 1.000 29 000.00 <br /> 0060 FLAGGING 0.000 0.00 1.000 25 000.00 <br /> 100.00 <br /> $50.00 HOUR 150.000 $7,500.00 0.000 <br /> 0070 AC PATCR, ALL DBPI'HS 50.00 154.000 $7,700.00 103.00 <br /> $165.00 TON 170.000 $19,800.00 0.000 <br /> 0080 TEMP. COLA MIX $0.00 156.990 $79,903.35 131.00 <br /> $2.75 S PT 2 175.000 5 981.25 8.000 <br /> 0090 CONCRETE 4" 0.00 1 283.000 3 528.25 59.00 <br /> $8.75 SQFT 3,200.000 $28,000.00 0.000 <br /> 0100 CONCRETE 9` $0.00 1,849.600 $16,184.00 58.00 <br /> $11.00 SQPT 2,300.000 $25,300.00 0.000 <br /> 0110 CONCRETH 7" $0.00 1,604.700 $17,651.70 70.00 <br /> $15.50 S FT 7 900.000 122 450.00 0.000 <br /> 0120 SHWER PIPS CIPP 6" 0.00 4,906.100 $76,044.55 M 62.00 <br /> $28.50 LINFT 1,212.000 $34,542.00 0.000 <br /> 0130 SEWER PI PH CIPP 8" 50.00 991.000 $28,243.50 82.00 <br /> $25.90 LINFT 8,399.000 $214,174.50 0.000 <br /> 0140 SEWER PIPH CIPP 10" 50.00 8,400.000 $214,200.00 M 100.00 <br /> $28.00 LINFT 711.000 19 908.00 0.000 <br /> 0150 SEWER PIPH CIPP 12" 0.00 711.000 $19,908.00 100.00 <br /> $33.00 LINFT 1,347.000 $43,104.00 0.000 <br /> 0160 SEWER PIPE CIPP 19` $0.00 1,347.000 $43,104.00 100.00 <br /> $150.00 LINPT 52.000 $7,800.00 0.000 <br /> 0170 SEWER PIPE PVC e" 50.00 0.000 $0.00 0.00 <br /> 55.00 LINPI 335.000 18 425.00 0.000 <br /> 0.00 355.000 19 525.00 106.00 <br /> i <br /> <br />