<br /> Billa~ Pro' eet ~OSts As Of 06~3OI~;~S - <br /> J Page ~ of q,~ <br /> <br /> 7/7/200> 3:03.47 PM "f'' <br /> <br /> Project Billed Acti- Total Amount Billed <br /> Billed By vi TranDate TranId Resource Employed uanti $Amount OperOvhd AdmOvhd Transaction Remark <br /> I <br /> <br /> 0405 Kevington (4252) $233.63 $285.19 $518.82 ' <br /> 3636213 Materials Testing $233.63 $285.19 $518.82 <br /> ZSSC Base aggregates quality control (CEl 818.67 $32.88 $61.55 <br /> ,,/6'22/2005 a13560125 Engineering Technician 2 I L-EI $22.67 $32.88 base agg dfs <br /> X622/2005 al3>60125 PASSENGER VANS 1 H $6.00 base agg dfs <br /> 286C Asphaltic concrete quality control (CE) 8153.79 8185.34 8339.13 <br /> /624/2005 x13560157 Engineering Technician 2 1 L-H $22.67 $32.88 base ac dfs <br /> ?6/24/2005 x13560157 PASSENGER VANS ! H $6.00 base ac dfs <br /> ~~6/28/2005 613740054 Engineering Associate 2 L-H $52.56 $76.23 Ac Testing <br /> X6/28/2005 613740054 CARGO VANS 2 H $10.00 Ac Testing <br /> ?6/29/2005 613740055 Engineering Associate 2 L-H $52.56 $76.23 Ac Testing <br /> ?629/2005 613740055 CARGO VANS 2 H $10.00 Ac Testing <br /> 322-6 Asphalt sample pickup 851.17 866.97 8118.14 <br /> ?6/28/2005 661930064 Engineer-In-Training 1 L-H $19.89 $28.85 Sample pickup <br /> x`6/29/2005 613740065 Engineering Associate 1 L-H $2628 $38 12 PU AC sample <br /> ?6i29i2005 613740065 CARGO VANS 1 H $5.00 PU AC sample <br /> <br />