Run Date: 12/01 06 15:56:58 City of Eugene
<br /> Estimate °-ribution
<br /> Estimate: WILLAKENZIE RD - Coburg-CalY -Final
<br /> Job 93-004251 WILLA1t8NZI8-PPP FROM COBURG TO CAL YOIING
<br /> Line No. Description Quantity Unit Unit Price Amount
<br />
<br /> WILLARBNZIE-PPP FROM COBURG TO CAL YOUNG
<br /> General
<br /> 0290. MOBILIZATION 1.00 LUMPSUM $15,000.00 $15,000.00
<br /> 0300. TEMPORARY WORK ZONE TRAFFIC CONTROL COMPLETE 1.00 LUMPSUM $12,000.00 $12,000.00
<br /> 0310. EROSION CONTROL 1.00 LUMPSUM $750.00 $750.00
<br /> 0320. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $200.00 $800.00
<br /> 0330. FLAGGING 316.50 HOUR $36.00 $11,394.00
<br /> 0340. POLICE FLAGGING 0.00 HOUR $65.00 $0.00
<br /> 0350. COLD PLANE PVMT REMOVAL, 2 IN DEEP 69,300.00 SQFT $0.13 $9,009.00
<br /> 0360. COLD PLANE PVMT REMOVAL, 0" to 2" DEEP 29,850.00 SQFT $0.25 $7,462.50
<br /> 0370. PAVEMENT REMOVAL 28,775.00 SQFT $0.60 $17,265.00
<br /> 0380. SURFACING STABILIZATION 526.23 CUYD $45.00 $23,680.35
<br /> 0390. LEVEL 2, 1/2 IN DENSE HMAC 1,902.67 TON $35.00 $66,593.45
<br /> 0400. LEVEL 2, 3/4 IN DENSE HMAC 1,421.58 TON $35.00 $67,255.30
<br /> 0410. TEMPORARY STRIPING 1.00 LUMPSUM $250.00 $250.00
<br /> 0420. THERMOPLAST, NON-PROF, 120 MIL, SPRAYED 1.00 LUMFSUM $12,000.00 $12,000.00
<br /> 0430. LOOP DETECTOR INSTALLATION 1.00 LUMPSUM $4,000.00 $4,000.00
<br /> 0440. PVMT LEGEND, TYPE A-1 or A-2: ARROWS 16.00 EACH $75.00 $1,200.00
<br /> 0450. FVMT LEGEND, TYPE A-1 or A-2: BICYCLE LANE S 6.00 EACH $90.00 $540.00
<br /> 0460. PVMT LEGEND, TYPE A-1 or A-2: STOP 7.00 EACH $145.00 $1,015.00
<br /> 0470. PVMT LINE, TYPE A-1 or A-2 694.50 SQFT $2.85 $1,979.33
<br /> 0480. BI-DIR YELLOW TYPE 1 MARKER 79.00 EACH $2.70 $213.30
<br /> 0490. MONO-DIR CRYSTAL TYPE 1 MARKER 134.00 EACH $2.70 $361.80
<br /> 0500. ADJUST VALVE BOXES 0.00 EACH $300.00 $0.00
<br /> 0510. CONCRETE WALKS 269.62 SQFT $5.00 $1,348.10
<br /> 0520. 3" PVC PIPE 15.00 LINFT $70.00 $1,050.00
<br /> 0530. REMOVE MEDIAN ISLAND 1.00 LUMPSUM $1,200.00 $1,200.00
<br /> 0540. CONCRETE CURB 55.30 LINFT $50.00 $2,765.00
<br /> 0550. TRUNCATED DOME TEXTURING 36.00 SQFT $25.50 $918.00
<br /> Total General $260,050.13
<br /> Total WILLARSNZIB-PPP FROM COBURG TO CAL YOUNG $260,050.13
<br />
<br /> WILLARBNZZS-PPP FROM COBURG TO CAL YOUNG - Other / Direct
<br /> General
<br /> 0010. PAVEMENT TESTING 1.00 EACH $3,755.91 $3,755.91
<br /> 0030. Advertising 1.00 LUMPSUM $149.84 $149.84
<br /> 0050. CONTINGENCY 0~ of Contract $0.00
<br /> 0060. Consultants 1.00 LUMPSUM $465.18 $465.18
<br /> 0070. Printing 1.00 LUMPSUM $49.67 $49.67
<br /> Total General $4,420.60
<br /> Total WILLAK8NZZ8-PPP FROM COBURG TO CAL YOUNG - Other / Direct $4,420.60
<br />
<br /> WILLARBNZZS-PPP FROM COBURG TO CAL YOUNG - Miscellaneous
<br /> General
<br /> 0010. Engineering Charge 1.00 LUMPSUM $54,905.17 $54,905.17
<br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 0.00 LUMPSUM $0.00 $0.00
<br /> Total General $54,905.17
<br /> Total WILLARSNZiB-PPP FROM COBURG TO CAL YOUNG - Miscellaneous $54,405.17
<br /> Total WILLAKENZIE RD - Coburg-CalY -Final $319,375.90
<br />
<br />
|