Billable Project Costs As Of 07/31 /2005 <br /> 08/26/2005 12:02:19 PM <br /> Page 3 of 71 <br /> Project Billed Acti- Total Amount Billed <br /> Billed ~ vi TranDate Tranld Resource Employ uanti Amount OperOvhd AdmOvhd Transaction Remark <br /> 0409 Willakenzie Rd (4251) $818.90 $978.88 $1,797.78 <br /> 3636213 Materials Testint=_ $818 90 978 88 1 797 78 <br /> 286C Asphaltic concrete ryuality control (CE) $818.90 $978.88 $J797 78 <br /> 07/25/2005 fl 3560073 Engineering Technician 2 2 L-H $46.24 $67.07 ac stand by <br /> 07/25/2005 fl3560073 PASSENGER VANS 2 H $12.00 ac stand by <br /> 07/25/2005 f13560103 Engineering Technician 2 2 L-H $69.36 $100.60 ac testing <br /> 07/25/2005 fl3560103 PASSENGER VANS 2 H $12.00 ac testing <br /> 07/26/2005 fl3560074 Engineering Technician 2 3 L-H 569.36 $100.60 ac stand by <br /> 07{26/2005 fl3560074 PASSENGER VANS 3 H $18.00 ac stand by <br /> 07/26/2005 fl3560104 PASSENGER VANS 3 H 518.00 ac testing <br /> 07/26/2005 fl 3560124 Engineering Technician 2 4 L-H 5138.72 5201.20 ac testing <br /> 07/26/2005 fl3560124 PASSENGER VANS 4 H $24.00 ac testing <br /> 07/26/2005 f71570044 Extra Help 3 L-H 530.12 $43.69 rice and BO of asphalt sample <br /> 07/27/2005 fl3560075 Engineering Technician 2 4 L-H S92.48 S134.13 ac stand by <br /> <br /> ~ 07/27/2005 fl3560075 PASSENGER VANS 4 H 524.00 ac stand by <br /> 07/27/2005 fl3560125 Engineering Technician 2 3 L-H $104.04 $150.90 ac testing <br /> 07/27/2005 fl3560125 PASSENGER VANS 3 H 518.00 ac testing <br /> 07/27/2005 f71570085 Extra Help 4 L-H 540.16 $58.25 asphalt Rice, BO, and SA <br /> 07/27/2005 f/1570095 Extra Help 1 L-H S15.06 $21.84 asphalt Rice, BQ, and SA <br /> 07/28/2005 fl3560076 Engineering Technician 2 3 L-H $69.36 5100.60 ac stand by <br /> 07/28/2005 fl 3560076 PASSENGER VANS 3 H 518.00 ac stand by <br /> ~r <br /> <br />