. - <br /> Run Date: 04/11/2006 11:08:22 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 Final Pay + <br /> Contractor: H & J CONST. Original Contract: $184,951.00 <br /> Job 93-004250 Current Amount: $195,923.36 <br /> Contract No: 2006-00009 Contract Award Date: 09/02/2005 <br /> PO 2006050168 Completion Date: 10/15/2005 <br /> Assessable: No <br /> Current Contract Hstimated Payment Cumulative Totals t Complete <br /> Line Description Last Chng Ord Uait Price Unit Measure Quantity Amount Quaat ity Amount Quantity Amount <br /> N 1ST AVH STN PIPS - SSNHG/99 <br /> General <br /> 0000 Liquidated Damages ($400.00) DAY 0.000 <br /> $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION ~ $31,500.00 LUMPSUM 1.000 <br /> $31,500.00 0.000 $0.00 1.000 $31,500.00 M 100.00 <br /> 0020 12 INCH C14 CL3 CCP PIPH $43.00 LINPT 133.000 <br /> $5,719.00 0.000 $0.00 174.000 $7,482.00 131.00 <br /> 0030 24 INCH RCCP PIPB $59.00 LINFT 68.000 <br /> $4,012.00 0.000 $0.00 42.000 $2,478.00 62.00 <br /> 0040 30 INCH RCCP PIPH $80.00 LII7PT 10.000 <br /> $800.00 0.000 $0.00 47.000 $3,760.00 !70.00 <br /> 0050 36 INCH RCCP PIPB $77.00 LINPT 1 460 000 <br /> $112 420 00 0 000 $0 00 1 414 000 $108 878 00 M 97 00 <br /> 0060 CONCRETE STORM DRAIN MANHOLES ~ <br /> $3,600.00 HACH 2.000 $7,200.00 0.000 $0.00 2.000 <br /> $7,200.00 100.00 <br /> 0070 CONCRETE MANHOLH, PLAT TOP W/C $4,000.00 HACH 5.000 $20,000.00 0.000 $0.00 5.000 $20,000.00 M 100.00 <br /> 0080 36° TRASH RACK $600.00 EACH 1.000 <br /> $600.00 0.000 $0.00 1.000 $600.00 100.00 <br /> 0090 CONNECTION TO EXISTING STRUCTU <br /> $500.00 HACH 1.000 $500.00 0.000 $0.00 1.000 <br /> $500.00 100.00 <br /> 0100 RR UNDER-CROSSING $150.00 HACH 2.000 <br /> $300.00 0.000 $0.00 2.000 $300.00 100.00 <br /> 0110 1" MINUS CRUSHED ROCK $20.00 CUYD 10.000 $200.00 0.000 $0.00 10.000 $200.OU 100.00 <br /> 0120 TV PIPE INSPHCTION $1.00 FOOT 1,700.000 $1,700.00 0.000 $0.00 1,798.000 $1,798.00 106.00 <br /> 0130 REMOVE 6 REROUTH 36" STM PIPE 001 <br /> $7,481.00 LUMPSUM 1.000 $7,481.00 0.000 $0.00 1.000 <br /> $7,481.00 100.00 <br /> <br /> 0140 12" STORM LATERAL-ADD 001 <br /> $2,743.92 LUMPSUM 1.000 $2,743.92 0.000 <br /> $0.00 1.000 $2,743.92 100.00 <br /> <br /> 0150 RIP RAP TO EAST END-ADD 001 <br /> $747.44 LUMPSUM 1.000 $747.44 0.000 $0.00 1.000 <br /> $747.44 100.00 <br /> $195,923.36 $0.00 $195,668.36 <br /> <br />