30-Jun-04 <br /> PROJECT: 4250 JOB NO:_ 4250 <br /> COMMENTS: <br /> W 1ST AVE STORM PIPE <br /> CD ORIGINAL UNIT <br /> CLASSIFICATION OF WORK CODE UNIT UANTITY PRICE AMOUNT <br /> 1 MOB, DEMOB & CLEANUP 3000 LS 1 $11,686.00 $11,686.00 <br /> 2 10" STORM PIPE 3210 LF 200 $20.00 $4,000.00 <br /> 3 30" STORM PIPE 3409 LF 530 $42.00 $22,260.00 <br /> 4 36" STORM PIPE 3210 LF 1400 $50.00 $70,000.00 <br /> 5 AREA DRAIN 3011 EA 4 $200.00 $800.00 <br /> g $0.00 <br /> 7 STORM MH STANDARD 3691 EA 5 $1,800.00 $9,000.00 <br /> 8 MH CUT IN 3778 EA 1 $800.00 $800.00 <br /> 9 RR UNDER-CROSSING EA 1 $10,000.00 $10,000.00 <br /> <br /> 10 $0.00 <br /> <br /> 11 TV INSPECTION 3960 LF $0.00 <br /> <br /> 12 $0.00 <br /> SUB TOTAL $128,546.00 <br /> CONTINGENCY 15 $19,281.90 <br /> SUB TOTAL $147,827.90 <br /> ENGINEERING 25% $36,956.98 <br /> TESTING 2% $2,956.56 <br /> ADMINISTRATION 5% $7,391.40 <br /> TOTAL $195,132.83 <br /> <br />