Run Date: 7/7/2005 ~ A' / <br /> ~~t~/ Page 1 <br /> City of Eugene <br /> Bid Tabulation <br /> Bid #2005-000021 <br /> Job No. 93-004260 <br /> 2005 WASTEWATER REPAIRS "OPEN TRNECH" BN BASIN PROJECT IS LOCATED PRIMARILY IN THE N.E. PORTION OF EUGENE LOCATED BETWEEN ECHO HOLLOW ROAD AND BETHEL DRIVE <br />FROM BARGER DRIVE TO ROOSEVELT BOULEVARD <br /> Engineer's Estimate Eu ene and & Gravel Wildish Construction H & J Construction Aelta Construction <br /> Line <br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price <br /> General Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $20,000.00 $20,000.00 $39,200.00 $39,200.00 $18,000.00 $18,000.00 $80,000.00 $80,000.06 $43,737.00 <br /> 20 TEMP PROTECTN/DIRECTN 1 LUMPSUM $6,000.00 $43,737.00 <br /> $6,000.00 $5,500.00 $5,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,600.00 $5,600.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $10,000.00 $10,000.00 $1,500.00 $1,500.00 $2,600.00 $2,600.00 $10,000.00 $10,006.00 $3,100.00 <br /> $3,100.00 <br /> 40 LANDSCAPE 1 LUMPSUM $2,500.00 $2,500.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $1,600.00 <br /> 50 POST TV INSPECTION 1 LUMPSUM $2,750.00 $2,750.00 $1,600.00 <br /> 60 FLAGGING $2,500.00 $2,500.00 $4,500.00 $4,500.00 $4,000.00 $4,000.00 $7,200.00 <br /> 70 HOUR $40.00 $2,800.00 $36.00 $7,200,00 <br /> $2,520.00 $50.00 $3,500.00 $46.00 $3,220.00 $47.00 $3,290.00 <br /> 70 AC PATCH, ALL DEPTHS SD TON $155.00 $12,400.00 $130.00 $10,400.00 $173.00 $13,840.00 $150,00 <br /> 80 CONCRETE 4" 100 SQFT $12,000.00 $125.00 $10,000.00 <br /> $9.00 $900.00 $15.00 $1,500.00 $19.00 $1,900.00 $20.00 $B.OD <br /> 90 CURB & GUTTER, REM/REPL 30 LINFT $30.00 $900.00 $42.00 ~ $2,000.00 $800.00 <br /> $1,260.00 $50.00 $1,500.00 $75.00 $2,250.00 $35.00 $1,050.00 <br /> 100 CURB & GUTTER WIDE, REM/REPL 20 LINFT $50.00 $1,000.00 $64.00 $1,280.00 $55.001/ $1,100.00 ~ $100.00 $2,000.00 <br /> 110 SPOT RfiPAIR EXC. STD DEPTH 5'-10' DEPTH 13 EACH $2,500.00 $50.00 $1,000.00 <br /> $32,500.00 $2,400.00 $31,200.Q0 $3,000.00 $39,000.00 $3,600.00 $46,800.00 $5,432.00 $70,616.00 <br /> 120 SPOT REPAIR EXC. DEEP 10'-15' 18 EACH $4,000.00 $72,000.00 $3,450.00 $62,100.00 $3,500.00 $63,000.00 $4,000.00 $72,000.00 <br /> $8,922.00 $160,596.00 <br /> 130 G" PVC SEWER PIPE 180 LINFT $100.00 $18,000.00 $3.00 $540.00 $12,60 $2,160.60 $16.00 $2,880.00 <br /> 140 SEWER PIPE PVC 4"/6" SVC LINE 125 LINFT $2 DO $35.00 $6,300.00 <br /> $60.00 $7,500.00 $250.00 $150.00 $18,750.00 $12.00 $1,500.00 $25.00 $3,125.00 <br /> 150 TREE PRESERVATION FENCING 100 LINFT $2.50 $250.00 $6.00 $600.00 $1.00 $100.00 $2.00 $200.00 <br /> 160 TREE PROTECTION ROOT ZONE EXC. 2 EACH $10.00 $1,000.00 <br /> $500.00 $1,000.00 $I, 000.00 $2,000.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $2,000.00 $4,000.00 <br /> 170 MH ADJUST - MINOR 2 EACH $400.00 $800.00 $1,000.00 $2,000.00 ` $600.00 $1,200.00 $500.00 $1,000.00 $500.00 <br /> <br /> GRAND TOTAL: $191,300.00 $166,850.00 J $179,150.00 $248,850.00 , $1,000.00 <br /> $324,014.00 <br /> ~~c,~ <br /> f <br /> 1 <br /> . `a <br /> <br />