<br /> Run Date: 01/08/2007 10:19:29 City of Eugene <br /> Estimate Distribution <br /> Estimate: 4258-26th & Hilyard; Cherry-FInal <br /> Job 93-004258 26TH & HILYARD TRAFFIC SIGNALS <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 26TH & HILYARD TRAFFIC SIGNALS <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $12,795.75 $12,795.75 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $14,043.00 $14,043.00 <br /> 0030. FLAGGERS 127.50 HOUR $38.00 $4,845.00 <br /> 0040. EROSION CONTROL 1.00 LUMPSUM $1,447.00 $1,447.00 <br /> 0050. TRUNCATED DOME TEXTURING 94.00 SQFT $39.50 $3,713.00 <br /> 0060. CONCRETE CURBS 141.50 FOOT $22.00 $3,113.00 <br /> 0070. CONCRETE CURB AND GUTTER 6.00 FOOT $72.00 $432.00 <br /> 0080. CONCRETE WALKS 968.10 SQFT $7.00 $6,776.70 <br /> 0090. CONCRETE TRAFFIC SEPARATOR 135.00 LINFT $25.25 $3,408.75 <br /> 0100. PAVEMENT LINE REMOVAL 1.00 LUMPSUM $978.00 $978.00 <br /> 0110. PVMT LEGEND, TYPE Al OR A2: ARROWS 3.00 EACH $110.00 $330.00 <br /> 0120. PVMT LEGEND, TYPE Al OR A2:BUS ONLY 2.00 EACH $403.00 $806.00 <br /> 0130. PVMT LINE, TYPE Al OR A2 346.00 SQFT $5.25 $1,816.50 <br /> 0140. THERMOPLASTIC, NON-PROFILE, 120 MIL, EXTRUDED 1.00 LUMPSUM $2,415.00 $2,415.00 <br /> 0150. REMOVAL OF EXISTING TRAFFIC SIGNALS 1.00 LUMPSUM $3,788.00 $3,788.00 <br /> 0160. TRAFFIC SIGNAL INSTALLATION 1.00 LUMPSUM $81,816.00 $81,816.00 <br /> 0170. INTERCONNECT CONDUIT IN HARD SURFACING 382.00 FOOT $17.50 $6,685.00 <br /> 0180. INTERCONNECT CONDUIT IN LANDSCAPED AREAS 10.00 FOOT $17.50 $175.00 <br /> 0190. REPAIR STM DRAIN LINES 001 1.00 LUMPSUM $509.00 $509.00 <br /> 0200. REMOVE CATCH BASIN CURBS 001 1.00 LUMPSUM $202.00 $202.00 <br /> 0210. REMOVE ABANDONED CULVERT 001 1.00 LUMPSUM $138.00 $138.00 <br /> 0220. INSTALL TE. IMP. SIGN SUPPORT 001 1.00 LUMPSUM $184.00 $184.00 <br /> 0230. INSTALL TEMP CONST. FENCE 001 1.00 LUMPSUM $381.00 $381.00 <br /> 0240. 5 SIGNS & POSTS INSTALLED 002 1.00 LUMPSUM $474.23 $474.23 <br /> 0250. OVER-EXCAVATE 4", PLACE GEO 003 1.00 LUMPSUM $641.16 $641.16 <br /> Total General $151,913.09 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS $151,913.09 <br /> 26TH & HILYARD TRAFFIC SIGNALS - Other / Direct <br /> General <br /> 0010. test 1.00 LUMPSUM $301.76 $301.76 <br /> 0020. Advertising 1.00 LUMPSUM $308.40 $308.40 <br /> 0030. Contingency 0~ of Contract $0.00 <br /> 0040. Printing ~ 1.00 LUMPSUM $312.35 $312.35 <br /> 0050. street lights 1.00 LUMPSUM $1,766.77 $1,766.77 <br /> 0060. Permits 1.00 LUMPSUM $123.64 $123.64 <br /> Total General $2.812.92 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS - Other / Direct $2,812.92 <br /> 26TH & HILYARD TRAFFIC SIGNALS - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $78,590.35 $78,590.35 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General $79,378.35 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS - Miscellaneous $79,378.35 <br /> Total 4258-26th & Hilyard; Cherry-FInal $234,104.36 <br /> • <br /> a <br /> r. <br /> <br />